Laserfiche WebLink
5) ROADS/STREETS. <br /> <br />Traffic Impact Studies shall be required for any Comprehensive Plan Amendment, rezoning, subdivision plat, <br />site plan, Conditional Use Permit, Certificate of Zoning Compliance, Preliminary Plat or Site Plan under the <br />following described conditions. <br /> <br />The types of traffic studies required under the ordinance are: <br /> <br />A Rezoning Traffic Analysis. The purpose of these studies will be to evaluate whether adequate transportation <br />capacity exists or will be available within a reasonable time period to safely and conveniently accommodate <br />proposed uses permitted under the requested land use or zoning classification. <br /> <br />· A Traffic Impact Report - This Report will be required for certain permitted and Conditional Uses, Land <br /> Subdivisions and Preliminary Plats exceeding specific trip generation threshold. <br /> <br />B) A Rezoning Traffic Analysis shall be required for: <br /> <br />· A proposed rezoning that could generate 100 or more directional trips during the peak hour or at least 1000 <br /> more trips per day for the most intensive use that could be developed under existing zoning; <br />· A proposed rezoning on a site located along or which has the potential to take access within 500 feet of a <br /> corridor identified as a freeway or expressway on the Thoroughfare Plan; <br />· A proposed amendment to the Comprehensive Plan involving more than one acre which would permit uses <br /> generating higher traffic than the existing Comprehensive Plan designation <br />· Where a Rezoning Traffic Analysis is required, the acceptance of the rezoning application for the purposes of <br /> beginning the mandatory 60 day time limit applicable to city action on a rezoning request shall not commence <br /> until the Rezoning Traffic Analysis has been reviewed for completeness and has been accepted by the <br /> Administrator as meeting the content requirements of the ordinance. <br /> <br />C) A Traffic Impact Report shall be required when a proposed conditional use, major subdivision, or major/minor <br /> site plan is: <br /> <br />· Of a land use type which has an average trip generation rate of 2,000 trips per day or greater, according to most <br /> current versions of the ITE Trip Generation Informational Report or comparable research data published by a <br /> public agency or institution; or <br />· Designed so that it utilizes an at-grade access opening onto an existing or proposed freeway or expressway as <br /> indicated on the Thoroughfare Plan. <br /> <br />D) The LOS for each zoning district tier shall be as listed in Table 1, below. <br /> <br /> Table 1 <br />ZONING DISTRICT TIER <br /> <br />Rural Suburban Urban <br /> <br />Freeway/Expressway C D n/a <br />Major thoroughfare C D n/a <br />Minor thoroughfare C D E <br />Minor arterial C D E <br />Major collectors C D E <br />Minor collector B D E <br />Local roads B C E <br />Local streets B C E <br /> <br />8 <br /> <br /> <br />