My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 10 21 (Regular)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 10 21 (Regular)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:52 PM
Creation date
11/27/2017 11:44:16 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/21/2002
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: October 15, 2002 <br /> <br />660 Concord Parkway North <br />PO Box 388 <br />Concord, NC 28026. 0388 <br /> <br />Facilities & Operations Department <br />Joe Sides, Construction Manager <br /> <br />(704) 786-6195 Ext. 193 <br />(704) 788-1317 Fax <br /> <br />To: Board of CommissiOners <br /> <br />From: Joe Sides, Construction Manager ~f. <br /> <br />Re: Contract Approval for Bethel Elementary <br /> <br />On October 14~h, 2002 the Board of Education approved the following contracts for the new <br />Bethel Elementary. <br /> <br />I. The grading package for Phase I has been negotiated with Culp Brothers, Inc. The <br />contract ($593,931.00) includes clearing, storm drainage, erosion control, temporary seeding and <br />gravel for the entrance road and parking lots; soil and rock allowances for $24,000.00 and a well <br />allowance of $10,000.00. The well will be used by the contractors during construction and will <br />be used to irrigate the ballfields once the building is complete. <br /> <br />II. In conjunction with the grading package negotiations have been completed with Qore <br />Property Sciences for soil testing. Qore will be on site during the grading work to evaluate and <br />perform density tests over the thirty (30) acre site. Qore has offered a not to exceed budget of <br />$18,200.00 <br /> <br />III. A steel contract has been negotiated with Southern Engineering for Bethel Elementary. <br />This is basically what we have done on the last three projects. No money will be spent on this <br />contract until funding is in place via sale of COP's. Southern Engineering will provide shop <br />drawings and submittals up front at no cost to the Owner until funding is in place, The process <br />will save us approximately 2 to 3 months of construction time on this project. The contract, <br />which includes the classroom alternate, is for $649,600.00. <br /> <br />The Board of Education is asking that the Board of Commissioners approve the above contracts <br />and provide necessary funding for the grading package as well as the testing by Qore. With <br />funding in place, this work can begin immediately. This will assist in expediting construction <br />process prior to potential poor, wet weather conditions in the winter. It is important that we <br />replace this school as soon as possible since maintenance costs are very high and we are <br />experiencing major problems with the operation of an outdated sewer plant. We have received <br />heavy fines as a result of equipment failure. <br /> <br />Thank you for your consideration. <br />cc: Board of Education <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.