My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 12 02
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 12 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:59 PM
Creation date
11/27/2017 11:44:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/2/2002
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
acoustics im¢orporated <br /> <br />Interior Sp~iah'~ ~ontraerors Stn¢~ 1945 <br /> <br />REQUEST FOR CHANGE ORDER <br /> <br />DATE: October 11, 2002 <br /> <br />TO: l~atthews Construction <br /> <br />ATTENTION: Darrell Robertson <br /> <br />PROJECT: Meetings Room Upflt-Expo <br /> <br />ADDRESS: Cabarrus County, NC <br /> <br />PROPOSAL #: 1448 B$ <br /> <br />The following Secfion~ me quoted per Qverc0~h D~rnmitt Architect~ plans (material and labor) including <br />addend~ N/__~/A_ · General contractor (owner or construction manager) tn furnish temporary heat~ power and <br />water (and hoisting, ff required) and haul off our stacked debris. All work contemplated is to be performed <br />during normal working hours. This quotation includes all applicable taxes and insurance, and is good for 30 <br />daya acceptance. Terms and conditions o£AIA Document A401 shall apply to this proposal. <br />Drawings dated 08-30-02 <br /> <br />DRYWALL PRICE- <br /> <br />$106,053.00 <br /> <br />DRYWAI.I. SCOPE: <br />Includes furnishing and installing metal stud framing, sound attenuation insulation'and drywall <br />per plans and speci~cations with the following qualifications: : <br /> <br />1. Drywall "Point-Up" to be performed under permanent lighting conditions and to be performed <br /> only once. All other repairs will be invoiced to the General Contractor. <br />2..4.ll exposed drywall wE be finished in accordance with the AMERICAN GYPSUM <br /> ASsocIATION~ recommended specification: LEVELS OF GYPSUM BOARD FINISH, <br /> 4 as described in publication GA-214-96. <br /> Drywall debris will be placed in an on-site Dumpster provided by the General Contractor at no <br /> cost to Acoustics, Inc. <br /> Includes labor to set hollow metal door frames. <br /> l~xclud¢~ drywall on the interior side of the exterior w~l]~ and double layer at roof deck (part of <br /> building shell scope) <br /> Excludes install.lng metal decking at mechanical platform. <br /> Excludes blocking and bracing for fixtures, equipment, casework or heavy trim. <br /> <br />4. <br />5. <br /> <br />6. <br />7. <br /> <br />ACOUSTICAL CEILING BID <br /> <br />SCOPE: Includes furnishing and instMling a standard 2x2 DX grid system with square edge ceiling <br />panels-ACT-1 g~-psum lay-in, ACT-2 Frost #412 as shown on the reflected ceiling plan. EXCLUDES <br />~sulation over acoustical ceiJ~gs. <br /> <br />PRICE ................................................................................................... $21.425.00 <br /> <br /> P.O. Box 242507 · Charlotte, NC 28224 · (704) 523-431g · Fax (704)522-82¢4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.