Laserfiche WebLink
New and establishes authority of this action Table 7.8.1 Acceptable Plant Species <br />more comprehensive listing of plant materials. <br /> <br />The primary difference is the establishment of the point system. As noted in the <br />UDO," The point system is established to ensure that a minimum level of <br />landscaping is achieved during development;"'. There are five plant types with <br />points attributed to each. The total point r~Ciuired for each site is the result of <br />an equation involving the dimensions of the site in question. The current <br />ordinance has shrubs and trees required by linear footage, leaving the <br />opportunity for mature, shade trees to be replace by smaller, ornamental trees. <br />The point system in the UDO allows maximum flexibility in placement of <br />materials and in landscape design for each site instead of prescribing a linear <br />placement of all plant materials. <br /> <br />Examples: <br /> <br />None <br /> <br /> <br />