My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2001 04 23
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2001
>
AG 2001 04 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:51:28 PM
Creation date
11/27/2017 11:45:24 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/23/2001
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NiICHAEL F. EASLEY <br /> <br /> STATE OF NORTH CAROLINA <br />DEPARTMENT OF TRANSPORTATION <br /> DMSION OF HIGHWAYS <br /> March 6, 2001 <br /> <br />W. LYNDO TIPPETT <br /> <br />Division 10 <br />District 1 - Cabarrus County <br /> <br />Mr. Steve Little <br />Cabarms County Parkz & Recreation <br />P.O. Box 707 <br />Concord, NC 28026-0707 <br /> <br />Subject: <br /> <br />Driveway Entrance Permit No. C-1172, SR 1778, Orphanage Rd., North Cabarrus Park <br /> <br />· Dear Mr. Little: <br /> <br />Enclosed is an executed copy of the subject Driveway Entrance Permit, which has.been reviewed by the appropriate <br />staff agencies within the Division of Highways. <br /> <br />The permit covers the following: <br /> <br /> Construction of one (1) thirty-eight ~38') enlrance with 100' - 15" RCP on SR 1778, reconfiguratign of the <br /> intersectibn with Slt. 1745, turn lanes and related construction including drainage modifications. <br /> <br />Additionally, $40,000 has been secured, referenced as W.O. # 6.660008, for the design and installation of a traffic <br />signal. The plans have been forwarded to Ms. Tania Sanders, Assistant Division Traffic Engineer, '..m an effort t.o <br />have the signal in plac? and operational by the Septembex 29, 2091 scheduled opening date ( per Mr. Steve Little). <br /> <br />My office is in receipt of a Performance & Indemnity Bond in the amount of $40,000.00 that will be held in the <br />District I Office for one (1) year after completion of the entrance and related construction. This approval is subject <br />to the attached Special Provisions. <br /> <br />The approval for the construction of sidewalk, planned by the City of Kannapolis, is not included herein. NCDOT <br />does not maintain sidewalk; however, its construction within the right of way will'require an encroachment <br />agreement. <br /> Sincerely, . <br /> J.~. Wilson, 1]I, PEt <br /> District Engineer <br /> <br />JKW/LPW <br />Atta. <br />cc: Mr. Benton G. Payne, PE, Division Engineer <br /> Ms. ~anice' Bobo, Cabarrm County Maintenance Eng/neer <br /> Mr. John Morast, Director of Transportation, City of Kannapolis <br /> Mr. Andrew Pack, RLA, Woolpert, LL?, 8731 Red Oak Blvd., Suite 101, Charlotte, NC 28217-3958 <br /> File <br /> <br />615 Con,cord Road, Albemarle, N. C. 28001 (704) 982-0104 Fax (704) 9820659 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.