My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2001 09 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2001
>
AG 2001 09 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:53:57 PM
Creation date
11/27/2017 11:46:05 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/17/2001
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve L. Little, CL? <br />August 14, 2001 <br />Page 2 <br /> <br />and a digital file in AutoCAD R14 format of the Map of Topographic Survey. <br /> <br />II. Wetland Delineation and Assistance with the Boardwalk Location <br /> <br />$3,000.00 <br /> <br />III. Design - based upon the Master Plan for North Cabarrus Park, <br />prepared by Woolpert, LLP. <br /> <br />Design - Staking Plan, Grading, Drainage, and Erosion Control <br /> Plan, Boardwalk Location, Pond Area Plan, Playground, <br /> Picnic Sites, Site Amenities including benches, tables, signs <br /> (Will use the same as specified for Phase 1 and 2.) <br /> <br />Preliminary Stakeout for Fieldwalk <br />(After preliminary plans are completed). WKD will provide <br />rough stake-out of the two ball fields and the playground for <br />field walk during the design process. <br />Permitting <br />Meetings <br />Reimbursables <br /> <br />Sub-total Design <br /> <br />$19,800.00 <br /> <br />$1,800.00 <br /> <br />$2,200.00 <br />$3,600.00 <br />$1,500.00 <br />$28,900.00 <br /> <br />IV. Construction Services <br /> <br />Construction Administration and Observation <br />12 weeks at 2 days per week <br /> <br />$12,000.00 <br /> <br />Construction Stakeout <br />WKD will provide the following construction stake-out services. <br /> 1. Stake-out the proposed ball fields for rough grading. <br /> <br />2. Stake-out the <br />3. Stake-out the <br />4. Stake-out the <br />5. Stake-out the <br />6. Stake-out the <br />7. Stake-out the <br /> <br />proposed ball fields for final grading. <br />proposed Boardwalk. <br />proposed playground area. <br />proposed parking lot for rough grading. <br />proposed parking lot for final paving and curb. <br />proposed walkways for grading. <br /> <br />$10t800.00 <br /> <br />Our costs are based on provided the above items one time only. Any <br />re-staking or additional services requested will be provided on a time <br />and material basis in accordance with our rate schedule in effect at the <br /> p/c'vcl/mk £g/N orr hCabar rus Pk-Ph3081401 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.