Laserfiche WebLink
.;AN-19-~ 14:16 G.L. WILSON BUILDING <br /> <br /> Cal~,~s C'aunty $¢hoo[$ Ad~ninistratlve Facility <br /> SCOPE OF WORK <br /> January 18, 2000 <br /> <br />1'~8'?~1 P, BS/1 1 <br /> <br />Parity: <br /> <br />· ~j,.;,,;.;,~;;o~ ~uit~tng~parking for ]~5 c~s. <br />Service Bui~i~ ~rki~ for 16 ~rs. <br /> <br />1,3~ to~ of ~o~ ~vi~, <br /> <br />F. toncrqte Sitework: · 1,652 SF of sidewalk for Admini~tratiQn Building. <br /> · 704 SF of sidewalk foe Service Building. <br /> <br />Fen¢inq: <br /> <br />Sigf~e: <br /> <br />~ L!e of ,sec~Py fence w~h 9e~eeeued the stone pev~n9. <br />2~H~mdicap peeking signs. <br /> <br />Landsca~nq: · T&mporary se~ding is not included. <br /> · Fir~al seeding for 2 ac~e~ Js incmded. <br /> <br /> · $20'.000;.~w,~,~, fm-randsca~ng trees and s~rubs. <br /> <br />Concrete Fomdetions: · Reinforced 3000 psi Concrete Foundations es required to acconu~od~te Pre-Engineered <br /> mc, Tel buitding stt'ucTu[e and uplifting loads. <br /> · I00 LF of ?tuck dock height concrete wall et the Service Building. <br /> <br />Cm~crete 51ab on Grade: <br /> · T~ne-slab-en-9,-~de shell be 5'*thJck,-$,0007~i concrete ~dth 6x6-10/10 WWM. <br /> <br />J D_]'v'r-¢'rnN. 4.- MASOI'~,¥.: ~ I <br /> <br />The Administration Building will have a 3' high by 340' face bdck knee wall. <br /> DZVZSION 5 - METALS: ~ <br /> <br />G. L. Wilson Building Company' <br />Page 3 of 9 <br /> <br /> <br />