Laserfiche WebLink
483 <br /> <br />CABARRUS COUNTY DEVELOPMENT SERVICES <br />BUILDING INSPECTIONS DIVISION <br />FEE SCHEDULE - EFFECTIVE JI/LY 1, ~000 <br />BUILDING PERMITS FOR NEW CONSTRUCTION <br /> <br />ESTIMATED COST FEE <br />$15,000.00 $ 71.00 <br />$16,000.00 $ 75.00 <br />$17,000.00 $ 79.00 <br />$18,000.00 $ 83.00 <br />$19,000.00 $ 88.00 <br />$20,000.00 $ 92.00 <br />$21,000.00 $ 96.00 <br />$22,000.00 $ 100.00 <br />$23,000.00 $ 104.00 <br />$24,000.00 $ 109.00 <br />$25,000.00 $ 113.00 <br />$26,000.00 $ I17.00 <br />$27,000.00 $ 121.00 <br />$28,000.00 $ 125.00 <br />$29,000.00 $ 130.00 <br />$30,000.00 $ 134.00 <br />$31,000.00 $ 130.00 <br />$32,000.00 $ 142.00 <br /> <br />Estimated cost that exceed $50, <br />$1,000.00. <br /> <br />Estimated cost for residential <br />of construction or $55.00 per <br /> <br />DRAFT <br /> <br />ESTIMATED COST FEE <br />$33,000.00 $ 146.00 <br />$34,000.00 $ 151.00 <br />$35,000.00 $ 155.00 <br />$36,000.00 $ 159.00 <br />$37,000.00 $ 163.00 <br />$38,000.00 $ 168.00 <br />$39,000.00 $ 172.00 <br />$40,000.00 $ 176.00 <br />$41,000.00 $ 180.00 <br />$42,000.00 $ 184.00 <br />$43,000.00 $ 188.00 <br />$44,000.00 $ 193.00 <br />$45,000.00 $ 197.00 <br />$46,000.00 $ 201.00 <br />$47,000.00 $ 205.00 <br />$48,000.00 $ 209.00 <br />$49,000.00 $ 214.00 <br />$50,000.00 $ 218.00 <br /> <br />000.00 will,be charged an additional $2.16 per <br /> <br />construction will be based on the total cost <br />square foot of heated space and $25.00 per <br /> <br />square foot of unheated space, whichever is greater. A $5.00 surcharge will <br />be added to these permits as required by the "Homeowners Recovery Fund". <br /> <br />Insulation Permits will be $15.00 per residential unit and $30.00 per <br />commercial/industrial building. <br /> <br />Mobile Home Permits will be $100.00. This permit fee will cover the mobile <br />home set up, electrical connections, and the plumbing connections. If the <br />home is being placed on a new lot there will be an additional W&S permit <br />required. The W&S permit is $20.00. <br /> <br />Daycare/Group Care Homes/Foster Care Home inspection will be $44.00. <br /> <br />Temporary Construction Trailer Permits are <br /> <br />Construction Plan Review Fee will be calculated at .02 per square feet of new <br />structures plus $50.00. This fee must be paid at the time that the plans are <br />submitted to be reviewed. <br /> <br />Replacement Building Permit Cards will be $2.50. <br /> <br />There will be a Fifty ($50.00) Dollar callback or re-inspection fee charge <br />for any return trip to a job site if the contractoK, sub contractor, or owner <br />is at fault for the re-inspection. <br /> <br />CABARRUS COUNTY DEVELOPMENT SERVCIES <br />BUILDING INSPECTION DIVISION <br />FEE SCNED~/LE - EFFECTIVE JLrLy 1, 2000 <br /> <br />BUILDING PERMIT FOR TEE ALTERATION, DEMOLITION, REMODEL, REMOVAL, <br />REPAIR, REROOFING, OR RECONSTRUCTION OF ANY STRUCTURE. <br /> <br />THIS SCHEDULE WILL ALSO APPLY TO ACCESSORY BUILDINGS. <br /> <br />~$T IMATED COST FEE <br />$ $ 1,000.00 $ 15.00 <br />$ 1, 001.00 $ 2,000.00 $ 19.00 <br /> $ 2,001.00 $ 3,000.00 $ 23.00 <br /> $ 3,001.00 $ 4,000.00 $ 27.00 <br /> $ 4,001.00 $ 5,000.00 $ 31.00 <br /> $ 5, OOI.O0 $ 6,000.00 $ 35.00 <br /> $ 6,001.00 $ 7,000.00 $ 40.00 <br /> $ 7,001.00 $ 8,000.00 $ 44.00 <br /> <br /> <br />