Laserfiche WebLink
$~:~-19-~ 14:16 G.L. WILSON BUILDING 17B48?~Sc~BI P.~/11 <br /> <br />Cabar~u$ County Schools A~. ministrative Facility <br />SCOPE OF WORK <br />January 18, 20~)0 <br /> <br />[ <br /> <br />Project Super~sian. <br />W=sl~ Od'spa~t ~rPca~<raCtor cre~tcd trash. <br />D~ign ~ E~i~i~ ~ O~wi~s re~i~ foe application for ~ildi~ P~t for ~e <br />~rti~ of'the ~ek i~ in ~is pr~o~l. <br />PrOfess & fill clan up.' <br />Te~ra~ ~ r~dred for c~uct~en. <br />~ild~'s Risk Z~nc~ <br />~i~ and bth~ p~mit are ~t i~l~d. <br />~ete t~i~. <br /> <br />DZVZ ON 2- <br /> <br />~lt ~itework prices ~e inclucl~d as allbwance~. Ttle'ailm~orR'alEm/anges are based on the <br /> Conceptual Site Development Ma~ter Plan' which defines the minimal site requirements. The <br /> <br />after the site plans are completed. <br /> <br />peoperty owner. <br /> <br />Gra~ n.q & Erosion Control: <br /> · Gr'admg'anct ErosiorrCon~tfl'l~ not Include~'.Th'e site r~ ~o ~e'l~e-graded. The g~adlng <br /> contractor is to IXOV(de seeding and maintain the erosion control measures. <br /> -- r-me~oJ;,,&,for 5 acres is included. <br /> <br />Site Drainaqe: <br /> · $i~ d,,s~iage altowa,~,.~ ~i~:tuded at $50,000.00. <br /> <br />5~,1~ U~liries: <br /> · IJtilify Arl0w~ce foe gas. w~ter and ~ewee is ,n~l~ at SZO,~.~. <br /> · Ext~ior fire protection lin~ AIl~nce is incl~ed at $Z7,~.~. <br /> 51re Lighti~ ~Jlo~nce: $49.~.~ <br /> Admini~cation Buildi~: <br /> · ~ark[~ I~ fig~i~ c~Sts of 10 ~¢h ~por~ wit~ 2-fixt~ p~ ~ch. <br /> · 12 ~llards a~ ~lk. <br /> - Set,ce Buildi~: <br /> · Fae~i~ lot ligEti~ consists of 6 ~ch ~ wi~ Z-fixtur~ per ~ch. <br /> · 12 ~ds along ~lk. <br /> · T~fees. ,,,~, tee~,'~e'f~s f~ ~ter a~r are not inclu~. <br /> <br />G. L Wilson Building Company <br /> Page 2 of g <br /> <br /> <br />