Laserfiche WebLink
02/09/99" 12:35 '{~?04 525 8539 WOOLPERT ~005/005 <br /> <br />Aa c~atc of probable construction costs will be p _re~d to identify thc total cost of~¢ project <br />ia 1999 dollars. This cstimatc will a]so be iht, pared to tdentif7 any pha<h~g of thc pm~ect as <br />agreed upon by the Owner aud thc Steering Conu~tte~, bas~ upon thc ~qn.nl costs. Woolpen will <br />mec~ one last time with the "Project Team" to review tbe final master plans and thc esfimntes oF <br />probable construction com~ <br /> <br />A ~ public prcscutation will be given bcfore the County C~Ttmi~ioner3 to inform them of~e <br />fin~! ~ pi~l ~fld {o obtain public consensus for t~ project. <br /> <br /> As afma{ delivcrablc, Woolpo't will provide one full size (I) color rendering of the master plan <br /> and on~ (1) ~epmducibl¢ mylar for us~ by fl~ ovn~r and {10) reduced colo~ copies (8'/ax 1 !). <br /> <br />Time Frame & Schedule <br />Woolpert can begin on thc prujcct immediatdy ~on receipt of rhi_q si{~d agreement. R~cipt ~ <br />~;~,~tance of the ag~".,emcnt will be our authorization to procccd Bascd upon ifluucdiate authorization of <br />the a~e~.m_-.,~ (February 15-19, 1~99) Wooipert will complete the project wi,j, lu four months by Junc 1, <br />1999. A mo;e defincd schcdulc will be defined a~ thc sra.-up meeting for the project. <br /> <br />Additional gerv{ce$ <br /> <br />The ~ilowing services arc not anticipated as being needed, however, thc,/are included as additional <br />so, vices. Should any o£thcsc or any other services bc desired, separate negotiations with ~c Owner will <br />bc <br /> <br />1. Providing services t~sulting from significant changes in thc c~cnt of thc proj~[. <br />2. A~d~g ~y ~ pr~ m~n~ ~ ,~n ~ly ~d~. <br />3. ~ p~ing s~ ~ ~ s~ifi~ly outline. <br />4. pr~nt-ti~ ofM~r P~ ~ ~y <br />5. P~g tO ~ or ~g ~ a ~ ~ core.ion w~ ~y public h~n~ mbi~n <br /> pr~g or !~ <br />6. Pm~ding ~ ~ p~ting or ~u~on of~ ~d s~fio~ not ~ <br /> <br />7. P~d~g ~ aefi~ ~i~ or prop~ / ~hy ~ ~o~fion. <br />8. Pro~d~g ~y digi~ ~der~ ~s of~e site ~lysis. ~nc~t ~ ~er pl~. <br />9. Pm~din~ ~y ~fio~ ~ ~n~ or pr~ m~e~ of&e p~k p~j~t. <br /> <br />Understandings <br /> <br />Tbe following unckmaadings ate provided for clarification of key project specifics: <br /> <br /> 1. Thc O~mer will provide ~ mapping to Woolpcrt for the preparation of the master plan project. <br /> This mapping shall be in a format compatible for usc in AutoCAD, rulcase 14. <br /> 2. Steve LiMe, Cabarras County Park's ~ R=creation Director shall act as thc sin$1~ point of <br /> contact for Woolpert during thc master planning process. Mr. Lit'tlc shall summafiz~ any program <br /> input f~om thc Church of Ged, Town of Ka~_n~polis, Cabam~ County, and/re' any Sl~Cial interest <br /> groups that may have involvement with this projcct. <br /> <br />Design Fee <br />Wcolgert will perform the nmaster plannln{ based upon the nforcmcntioned scope of~rvicos, ~or a lump <br />sum icc basis for $15,000.00. Wcolp~rm to invoice thc Client mo.thly ba~ed on a perc~nt~c of work <br />,~,,pl~_-d. <br /> <br />Fet,. 9,1699 <br /> <br />4 S~FtT.P~ <br /> <br /> <br />