Laserfiche WebLink
CHANGE ORDER <br /> <br /> No. <br /> <br />DATE OF ISSUANCE April 1. 1999 EFFECTIVE DATE April 1. 1999 <br /> <br />OWNER Cabarrus County <br />CONTRACTOR Brown Utility Co. , <br />Contract: Frank Liske Park Dam / Lake Concord Dam <br />ENGINEER Dewberry. & Davis <br /> <br />You are directed to make the following changes in the Contract Documents: <br />Description: 1. Add 6 inch valve in outlet structure $ 600 <br /> 2. Grade, place filter fabric, and place rip rap on 1,500+ LF <br /> (i,000 SqYd) of wave erosion around lake ~ $35.00/SqYd $35,0000 <br /> <br />Reason for Change Order: <br /> <br /> I. Added flexibility in lowering lake level <br /> 2. Repair wave erosion around lake <br /> <br />Attachments: (List documents supporting change) <br /> <br /> CHANGE IN CONTRACT PRICE: <br />Original Contract Price <br /> <br /> $ 123.900.00 <br /> <br />Net Increase (Decrease) from previous Change Orders <br />No. to : <br /> <br />$ ,00 <br /> <br />Contract Price prior to this Change Order: <br />$ 123.900.00 <br /> <br />Net increase (decrease) of this Change Order: <br />$ 35.600.00 <br /> <br />Contract Price with all approved Change Orders: <br />$ 159.500.00 <br /> <br />CHANGE IN CONTRACT TIMES: <br /> <br />Original Contract Times: <br />Substantial Completion: 90 <br />Ready for final payment: <br /> (days or dates) <br /> <br />Net change from previous Change Orders No. to <br />No. : <br /> Substantial Completion: 0 <br /> Ready for final payment: 0 <br /> (days) <br /> <br />Contract Times prior to this Change Order: <br /> Substantial Completion: 90 <br /> Ready for final payment: 10.5 <br /> (days or dates) <br /> <br />Net increase this Change Order: <br /> Substantial Completion: 4;~ <br /> Ready for final payment: 4.5 <br /> (days) <br /> <br />Contract Times with all approved Change Orders: <br /> Substantial Completion: I <br /> Ready for finalpayment: 150 , <br /> (days or dates) <br /> <br />RECOMMENDED: <br /> <br />ENGINEER (Authorizej~/Signature) <br />Date: 7~ 9'q <br /> <br />APPROVED: <br />By: <br /> <br />OWNER (Authorized Signature) <br />Date: <br /> <br />ACCEP_TF_~D:. <br /> <br />EJCDC 1910-8-B (1996 Edition) <br />Prepared by thc Engineers Joint Contract Documents Committee and endorsed by Thc Associated General Contractors of America and thc Construction Specifications Institute. <br />S:~PRO.I ECTS\CT094~CHGORDER. DOC <br /> <br /> <br />