Laserfiche WebLink
SCOPE OF <br /> <br />Constructability Review at 90% <br /> <br />Value Engineering Final Review at 90% <br /> <br /> Final Constructability and Value <br />Prepare Construction Schedule <br /> <br />Prepare Construction Estimate <br /> <br />Project Director <br />Sr. Project Manager <br />Project Manager <br />Project Engineer <br />MP&E Specialist <br />Admin. Asst. <br /> <br />Project Director <br />Sr. Project Manager <br />Project Manager <br />Value Eng. Consult <br />Project Engineer <br />Admin. Asst. <br /> <br />12 <br />115 <br />120 <br />120 <br />75 <br />24 <br /> <br /> 4 <br />40 <br />60 <br />20 <br />60 <br />20 <br /> <br /> Engineerin8 Final Review at 90% <br />IProject Director 4 <br />Sr. Project Manager 90 <br />Sr. Proj. Scheduler 95 <br />Project Manager 60 <br /> <br />Construction Schedule <br /> <br />Project Director <br />Sr. Project Manager <br />Project Manager <br />Estimator/Proj. Eng. <br />Admin. Asst. <br /> <br /> 4 <br />45 <br />60 <br />85 <br /> 4 <br /> <br />$135 $1,6213 <br />$75 $8,625 <br />$75 $9,0O~ <br />$75 $9,00t3 <br />$110 $8,2513 <br />$45 $1,080 <br /> <br />$135 $5413 <br />$75 $3,000 <br />$75 $4,500 <br />$125 $2,50~ <br />$75 $4,500 <br />$45 <br /> <br /> Subtotal = <br /> <br />$135 $5413 <br />$75 $6,750 <br />$85 $8,075 <br />$75 $4,500 <br /> <br />Subtotal = <br /> <br />$1351 $540 <br />$751 $3,375 <br />$751 $4,50O <br />$751 $6,375 <br /> ·$,80 <br /> <br /> Subtotal =l <br /> <br />$53,515 <br /> <br />$19,865 <br /> <br /> Construction Estimate $14,970 <br />Bid and Award Assistance IIPr°ject <br /> Director <br /> 2 <br /> $135 <br /> ISr. Project Manager 16 $75 $1,200 <br /> IProject Manager I6 $75 $1,200 <br /> <br /> Bid & Award Assistance Subtotat = $2,400. <br />Travel Expenses Local M{leage(800mi @ 0.40) $320 <br />Printing and Reproduction $3,000 <br /> <br />Grand Total = $180,525 <br /> <br />H.R. Gray & Associates, Inc. ~__~""--3 Page 6 <br /> <br /> <br />