My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1999 12 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1999
>
AG 1999 12 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:02:48 PM
Creation date
11/27/2017 11:50:25 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/20/1999
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inconsistent with the intern of the contract documents. Such changes shall be affected by <br />written order issued through the Consultant. <br /> <br />1.5.17 <br /> <br />1.5.18 <br /> <br />1.5.19 <br /> <br />1.5.20 <br /> <br />1.5.21 <br /> <br />1.5.22 <br /> <br />The Consultant shall conduct inspections to determine the Dates of Substantial <br />Completion and final completion and shall issue appropriate Project Certificates for <br />Payment. These inspections will be completed during site visits. Substantial completion <br />is work that is sufficiently complete, in accordance with the contract documents, so that <br />the work can be utilized for the purposes for which it is intended. <br /> <br />The Consultant shall receive and forward to the County for their review, written <br />warranties, certificates of occupancy and related documents assembled by the contractors. <br /> <br />The extent of the duties, responsibilities, and limitations of authority of the Consultant as <br />a representative of the owner during construction shall not be modified or extended <br />without the written consent of the County and the Consultant, which consent shall not be <br />unreasonably withheld. <br /> <br />The Consultant shall schedule and conduct a final inspection of the project, coordinating <br />the date for such inspection with the prime contractor and County. <br /> <br />The Consultant's and contractor's personnel shall conduct an on-site mn-through of the <br />operations and maintenance of the completed project with the appropriate County <br />personnel. <br /> <br />The Consultant shall provide a set of reproducible record drawings on Mylar showing <br />only significant changes in the work made during the construction process based on <br />marked-up prints, drawings, and other data furnished by the contractor and the County <br />representative in the field. <br /> <br />ADDITIONAL SERVICES <br /> <br />The following services are not included in services as outlined in Section I. They shall be <br />provided if authorized or confirmed in writing by the County, and they shall be paid for by the <br />County as provided in this Agreement. <br /> <br />2.1.1 <br /> <br />Providing services resulting from significant changes in, the extent of thc project as <br />defined in the schematic design program including, but not limited to, changes in size and <br />complexity. The anticipated budget for construction is estimated at $ 474,480.00. <br /> <br />2.1.2 Providing services resulting from preparing additional separate sets of construction <br /> documents other than stated in the Agreement. <br /> <br />2.1.3 <br /> <br />Providing services to investigate existing conditions or facilities, or to make measured <br />drawings thereof, or to verify the accuracy of drawings or other information furnished by <br />the Counties in conjunction therewith. <br /> <br />2.1.4 Providing services in connection with alternative design for cost estimating or bidding <br /> purposes. <br /> <br />woolpen <br />12/9/99 <br /> <br />Professional Se~/ice A~reement <br />Cabarrus Count, NC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.