My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1998 02 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1998
>
AG 1998 02 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:04:26 PM
Creation date
11/27/2017 11:50:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/16/1998
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 12 <br />OTHER CONDITIONS OR <br />SERVICES <br /> <br />12.1 CONSTRUCTION <br />PHASE ADMINISTRATION <br /> <br />12.1.1 The Architect will visit the site <br />four times during the construction period <br />to review construction progress, and two <br />additional times for punch list and final <br />reviews. The plumbing, mechanical, and <br />electrical engineers will visit the site two <br />times each to review progress and one <br />time each for punch list review. <br /> <br />12.2 DISPUTE RESOLUTION <br /> <br />12.2.1 Ifa dispute arises out of or <br />related to this Agreement, or its alleged <br />breach, and if that dispute has not been <br />settled through direct discussions within <br />a reasonable period, the parties to this <br />Agreement agree to first endeavor to <br />settle the dispute in an amicable manner <br />by submitting the dispute to a mutually <br />acceptable mediator under the <br />Construction Industry Mediation Rules, <br />before having recourse to a judicial <br />forum. Each party further agrees that it <br />will endeavor to follow a similar dispute <br />resolution procedure to resolve any <br />disputes against any third parties <br />(including the Contractor) which arise <br />out of or relate to work. <br /> <br />12.3 LIMITATIONS OF <br />LIABILITY <br /> <br />12.3.1 In recognition of the relative risks <br />and benefits of the project to both Owner <br />and Architect, the risks have been <br />allocated such that the Owner agrees to <br /> <br />the fullest extent permitted by law, to <br />limit the liability of the Architect and his <br />or her subconsultants to the Owner and <br />to all construction contractors and <br />subcontractors on the project for any and <br />all claims, losses, costs, damages of any <br />nature whatsoever or claims expenses <br />from any cause or causes, so that the <br />total aggregate liability of the Architect <br />and his or her subconsultants to all those <br />named shall not exceed $250,000, or the <br />Architect's total fee for services rendered <br />on this project, whichever is greater. <br />Such claims and causes include, .but are <br />not limited to negligence, professional <br />errors or omissions, strict liability, breach <br />of contract or warranty. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.