Laserfiche WebLink
7.3 SYSTEM CONSTRUCTION SCHEDULE. The Franchise shall <br />specify the construction schedule. <br /> <br /> 7.4 EXTENSION OF SERVICE. The Grantee shall provide service to all <br />dwelling units or commercial subscribers within one hundred fifty (150) feet of the <br />existing system and in any additional areas in the County as specified in the Franchise. <br /> <br />7.5 USE OF STREETS. <br /> <br /> A. Underground ln.qtaHation. All installations shall be underground in <br />those areas of the County where public utilities providing both telephone and electric <br />service are underground at the time of installation. In areas where either telephone or <br />electric utility facilities are above ground at the time of installation, Grantee may install <br />its service above ground, provided that at such time as those facilities are required to be <br />placed underground by the County or are placed underground, the Grantee shall <br />likewise place its services underground without additional cost to the County. Where <br />not otherwise required to be placed underground by this Ordinance or the Franchise, <br />the Grantee's system shall be located underground at the request of the adjacent <br />property owner, provided that the excess cost over the aerial location shall be borne by <br />the property owner making the request. All cable passing under the roadway shall be <br />installed in conduit. <br /> <br /> B. Permits. Grantee shall at all times comply with normal County <br />permitting processes. <br /> <br /> C. Interference with Persons, Improvements, Public and Private <br />Property and Utilities. The Grantee's system, including poles, lines, facilities, <br />equipment and all appurtenances, shall be located, erected and maintained so that such <br />facilities shall: <br /> <br />(1) Not endanger or interfere with the health, safety or lives or persons; <br /> <br />(2) <br /> <br />Not interfere with any improvements the County or State may deem <br />proper to make; <br /> <br />(3) <br /> <br />Not interfere with the free and proper use of public streets, alleys, <br />bridges, easements or other public ways, places or property, except to <br />the minimum extent possible during actual construction or repair; <br /> <br />(4) <br /> <br />Not interfere with the rights and reasonable convenience of private <br />property owners, except to the minimum extent possible during actual <br />construction or repair; and <br /> <br />31 <br /> <br /> <br />