My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1998 02 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1998
>
AG 1998 02 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:04:26 PM
Creation date
11/27/2017 11:50:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/16/1998
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall use its best efforts to locate, in advance, any water, sewage, or drainage lines or <br />to any other municipal structures in the streets during the construction due to the <br />presence, negligence, operation or maintenance of the Cable Television System, the <br />sole cost of such repairs including all services and materials will be filed against the <br />Grantee and these charges shall be paid immediately or the County may foreclose on <br />performance bonds, or invoke other appropriate sanctions provided for in this <br />Ordinance or in the Franchise. <br /> <br />7.6 ERECTION, REMOVAL AND COMMON USE OF POLES. <br /> <br /> A. Approval for Poles. No poles shall be erected by the Grantee without <br />prior approval of the County with regard to location, height, types and any other <br />pertinent aspect. However, no location of any pole or wire-holding structure of the <br />Grantee shall give rise to a vested interest and such poles or structures shall be removed <br />or modified by the Grantee at its own expense whenever the County determines that the <br />public convenience would be enhanced thereby. <br /> <br /> B. Requirements to Use Existing Poles. Where poles already exist for use <br />in serving the County are available for use by the Grantee, but it does not make <br />arrangements for such use, the County may require the Grantee to use such poles and <br />structures if it determines that the public convenience would be enhanced thereby and <br />the terms of the use available to the Grantee are just and reasonable. <br /> <br />7.7 CONSTRUCTION REPORTING REQUIREMENTS. <br /> <br /> A. Notice of Commencement. Thirty (30) days prior to the <br />commencement of construction, the Grantee shall provide the County with a written <br />notice of the commencement of construction. <br /> <br /> B. Progress Reports. Written progress reports shall be submitted to the <br />County thereafter, on a quarterly basis throughout the entire construction process. The <br />County Manager may require more frequent reporting if he/she determines it is <br />necessary to better monitor the Grantee's progress. The Grantee and County shall <br />work cooperatively to establish the content and format of the report. <br /> <br /> C. Subscriber Information. The Grantee shall produce an informational <br />document (e.g., door hanger), to be distributed to all residents of the area to be under <br />construction, which shall describe the activity that will be taking place. A copy of this <br />document shall be sent to the County Manager for review. <br /> <br />7.8 TESTS AND PERFORMANCE MONITORING. <br /> <br /> A. Completion Tests. Not later than sixty (60) days after any new or <br />substantially rebuilt portion of the system is made available for service to subscribers, <br />the Grantee shall conduct technical performance tests to demonstrate full compliance <br /> <br />33 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.