My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1998 03 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1998
>
AG 1998 03 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:05:02 PM
Creation date
11/27/2017 11:51:08 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/16/1998
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subdivision Name: <br /> <br />Developer/Owner: <br /> <br />Location: <br /> <br />Township: <br /> <br />Water System: <br /> <br />Sewer System: <br /> <br />Number of Lots: <br /> <br />Surveyor: <br /> <br />Zoning: <br /> <br /> SUBDIVISION REVIEW <br /> <br /> Highland Creek <br /> <br /> Westbrook Highland Creek, LLC <br /> <br />Adjoins the existing Highland Creek Development in Mecklenburg <br />County <br /> <br />2 <br /> <br />Charlotte-Mecklenburg Utilities Department <br /> <br /> Water and Sewer Authority of Cabarrus County <br /> <br />67 <br /> <br />McKim and Creed <br /> <br />PUD <br /> <br />Status of Improvements: <br /> <br /> I. No improvements have been made at the present <br /> <br />1. Lots and open space meet MDR customized development standards <br /> <br />2. The original PUD rezoning required connection be made to Ellenwood Road to provide <br />access fi.om Cabarms County. The Sheriffs Department and schools have both expressed <br />concern on the lack of Cabarrus County access at this time. Clark Creek Parkway is <br />proposed to be extended to Ellenwood Road. <br /> <br /> Staff recommends that no occupancy permits be issues until access from Ellenwood <br />Road has been constructed to NCDOT specificationns, as required by the ordinance. <br /> <br />3. Staff recommends the 100 year flood line be determined from field survey work prior <br />to building permits being issued for any lots adjoining the creek. A certificate of <br />elevation will be required for all lots with a substantial area in the 100 year line. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.