Laserfiche WebLink
OPERATIONS PLAN <br />TABLE OF CONTENTS <br /> <br />Pa,qe <br /> <br />1.0 C&D LANDFILL OPERATIONS AND MAINTENANCE <br /> <br />1.1 Project Description <br />1.2 Hours of Operation <br />1.3 landfill Capacity <br />1.4 Landfill Development <br />1.5 Qperating Equipment <br />1.6 Training of Facility Personnel <br />t.7 Stormwater Collection and Removai <br />1.8 Waste Placement <br />1.9 Waste Acceptance <br /> <br />2.0 SITE OPERATIONS AND MAINTENANCE <br /> <br />2._1 Entranceway <br />2.2 Recycling Center <br />2_3 Acce.~-~ and Security Requicements <br />2.4 Erosion/Sedimentation Control Maintenance <br />2_5 Landscaping_Maintenance <br />2.6 Dust, Litter, Odors, and Vectors <br />2.7 Landfit[ Signs <br />2.8 Fire Control <br /> <br />3.0 WATER QUALITY MONtTORING <br /> <br />3.1 Grounb~ccater Monitoring <br />3.2_ Surface. Water Monitoring. <br /> <br />4.0 CLOSURE/POST-CLOSURE <br /> <br />4_l Closuce Design <br />4.2 Final Cover Vegetation and Maintenance <br />4.3 Post-Closure Property Use <br /> <br />APPENDIX <br /> <br />1 <br /> 1 <br />2 <br />2 <br />3 <br />3 <br />4 <br />4 <br />5 <br /> <br />5 <br />6 <br />6 <br />7 <br />7 <br />8 <br />8 <br />9 <br /> <br /> 9 <br />10 <br /> <br />10 <br />10 <br />11 <br /> <br /> <br />