My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1998 05 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1998
>
AG 1998 05 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:06:15 PM
Creation date
11/27/2017 11:51:42 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/18/1998
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SR 1275 (Spring Drive) from SR 1123 to <br />End Maintenance. Paving Priority No. 9F <br />Subdivision. Grade, drain, base, pave and <br />erosion control. Length 0.35 Mi. <br /> <br />43,000.00 <br /> <br />SR 2285 (Pinebrook Trail) from SR 2000 <br />to End Maintenance. Paving Priority No. 10F <br />Subdivision. Grade, drain, base, pave, and <br />erosion control. Length 0.23 Mi. <br /> <br />28,000.00 <br /> <br />10 <br /> <br />SR 2342 (Lilly Drive) from SR 1123 to End <br />Maintenance. Paving Priority No. 11 <br />Subdivision. Grade, drain, base, pave and <br />erosion control Length 0.10 Mi. <br /> <br />11,000.00 <br /> <br />I1 <br /> <br />SR 2359 (Sagebrush Circle) from SR 1148 <br />to SR 1148, SR 2360 (Walden Lane) from <br />SR 2359 to SR 2359, and SR 2361 (Forsythe <br />Lane) from SR 2359 to SR 2359. Paving Priority <br />No. 12 Subdivision. Grade, drain, base, pave, <br />and erosion control. Length 0.99 Mi. <br /> <br />127,000.00 <br /> <br />TOTAL PROGRAM <br /> <br />$ 818,000.00 <br /> <br />NOTE 1: If right of way cannot be obtained for the above roads, or if <br /> additional funds are received, we will apply funds to the next <br /> roads, or roads, in priority order. <br /> <br />NOTE: 2: PROGRAM SUBJECT TO AVAILABELITY OF FUNDING,. <br /> RIGHT OF WAY AND ENV-[RONMENTAL REVIEW. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.