577
<br />
<br /> Mr. J. A. Hough, District Engineer with the North Carolina Department of
<br />Transportation, presented the following proposed 1998-99 Secondary Road
<br />Construction Program for Cabarrus County. The Department of Transportation
<br />published the notice of the presentation in THE INDEPENDENT TRIBUNE, and the
<br />Clerk posted the proposed program on the Courthouse bulletin board.
<br />
<br /> CABARRUS COUNTY
<br /> 1998 Secondary, Tr~stt and Bond Construction Program
<br />
<br />Unallocated Balance 97-98 Regular Funds $ -4,000.00
<br />Unallocated Balance 97-98 Trust Funds 90,000.00
<br />Unallocated Balance 97-98 Bond Funds 40,000.00
<br />1998-99 Regular Secondary Construction Funds (Estimated) 432,565.00
<br />1998-99 Secondary Trust Funds (Estimated) 344,622.00
<br />1998-99 Secondary Bond Funds (Estimated) 205,495.00
<br />Total Funds Available (Estimated) $1,108,682.00
<br />
<br />Reserve Approximately 10% for Overruns, Road 110,245.00
<br /> Additions, Property Owner Participation Paving
<br /> And Contingencies
<br />Surveys and Right of Way Acquisition 15,000.00
<br />Reserve 20% of Regular and Trust Funds for Maintenance 155,437.00
<br />Supplement W.O. 6.662417 - Volunteer Fire Dept. Maintenance 10~000.00
<br />Total Deductions $ 290,682.00
<br />FUNDS AVAILABLE FOR PROJECTS $ 818,000.00
<br /> PROGRAM
<br />
<br />MAP NO. DESCRIPTION ~OUNT
<br />1 SR 2691 (Busbin Road) from SR 2444 to End $107,000.00
<br /> Maintenance. Paving Priority No. 4F Rural.
<br /> Grade, drain, base, pave and erosion control.
<br /> Length 0.67 Mi.
<br /> SR 1181 (Helmdale Road) from SR 1127 to SR 1125.
<br /> Paving Priority No. 5F Rural. Grade, drain, base,
<br /> pave and erosion control. Length 1.00 Mi.
<br /> SR 1929 (Isenhour Road) from SR 1625 to End
<br /> Maintenance. Paving Priority No. 6F Rural.
<br /> Grade, drain, base, pave and erosion control.
<br /> Length 0.58 Mi.
<br /> SR 1190 (Edgefield Road) from SR 1105 to End
<br /> Maintenance. Paving Priority NO. 7F Rural.
<br /> Grade, drain, base, pave and erosion control.
<br /> Length 0.84 Mi.
<br /> SR 2601 (Bethel Church Road) from SR 2444 to
<br /> Cabarrus/stanly Co. Line. Paving Priority No. 8F
<br /> Rural. Grade, drain, base, pave and erosion
<br /> control. Length 1.2 Mi.
<br /> This project is partially funded. Funds to complete
<br /> project will come from 1999-2000 funds unless
<br /> additional funds are received.
<br /> SR 2484 (Woodway Drive) from SR 2640 to End
<br /> Maintenance. Paving Priority NO. 7F Subdivision.
<br /> Grade, drain, base, pave and erosion control.
<br /> Length 0.26 Mi.
<br /> SR 1253 (Wickersham Rd.) from SR 1252 to End
<br /> Maintenance. Paving Priority No. 8F Subdivision.
<br /> Grade, drain~ base, pave and erosion control.
<br /> Length 0.22 Mi.
<br /> SR 1275 (Spring Drive) from SR 1123 to End
<br /> Maintenance. Paving Priority No. 9F Subdivision.
<br /> Grade, drain, base, pave and erosion oontrol.
<br /> Length 0.35 Mi.
<br /> SR 2285 (Pinebrook Trail) From SR 2000 to End
<br /> Maintenance. Paving Priority No. 10F Subdivision.
<br /> Grade, drain, base, pave and erosion control.
<br /> Length 0.23 Mi.
<br /> SR 2342 (Lilly Drive) from SR 1123 to End
<br /> Maintenance. Paving Priority No. ll Subdivision.
<br /> Grade, drain~ base, pave and erosion control.
<br /> Length 0.10 Mi.
<br /> SR 2359 (Sagebrush Circle) from SR 1148 to SR
<br /> SR 1148, SR 2360 (Walden Lane) from SR 2359 to
<br /> SR 2359, and SR 2361 (Forsythe Lane) from SR 2359
<br />
<br />2 143,000.00
<br />3 85,000.00
<br />
<br />4 · 130,000.00
<br />
<br />5 87,000.00
<br />
<br />6 29,000.00
<br />
<br />7 28,000.00
<br />
<br />8 43,000.00
<br />
<br />9 28,000.00
<br />
<br />10 11,000.00
<br />
<br />11 127,000.00
<br />
<br />
<br />
|