Laserfiche WebLink
8 <br /> <br />SR 1275 (Spring Drive) from SR 1123 to <br />End Maintenance. Paving Priority No. 9F <br />Subdivision. Grade, drain, base, pave and <br />erosion control. Length 0.35 Mi. <br /> <br />43,000.00 <br /> <br />SR 2285 (Pinebrook Trail) from SR 2000 <br />to End Maintenance. Paving Priority No. 10F <br />Subdivision. Grade, drain, base, pave, and <br />erosion control. Length 0.23 Mi. <br /> <br />28,000.00 <br /> <br />10 <br /> <br />SR 2342 (Lilly Drive) from SR 1123 to End <br />Maintenance. Paving Priority No. Il <br />Subdivision. Grade, drain, base, pave and <br />erosion control Length 0.10 Mi. <br /> <br />11,000.00 <br /> <br />11 <br /> <br />SR 2359 (Sagebrush Circle) from SR 1148 <br />to SR 1148, SR 2360 (Walden Lane) from <br />SR 2359 to SR 2359, and SR 2361 (Forsythe <br />Lane) from SR 2359 to SR 2359. Paving Priority <br />No. 12 Subdivision. Grade, drain, base, pave, <br />and erosion control. Length 0.99 Mi. <br /> <br />127,000.00 <br /> <br />TOTALPROGRAM <br /> <br />$ 818,000.00 <br /> <br />NOTE 1: If right of way cannot be obtained for the above roads, or if <br /> additional funds are received, we will apply funds to the next <br /> roads, or roads, in priority order. <br /> <br />NOTE: 2: PROGRAM SUBJECT TO AVA[LABILITY OF FUNDING,. <br /> RIGHT OF WAY AND ENVIRONMENTAL REVIEW. <br /> <br /> <br />