Laserfiche WebLink
ILL <br /> <br />Memorandum <br /> <br />DATE: Mamh 31, lgg7 <br /> <br />TO: Stew Little <br />FROM: Bitt Co~hmn <br /> <br />RE: Darns It Laka Co~¢ord & Frank Nske Park <br /> <br />CC: Tim Lowder, PE <br /> <br />Frank C. Cocldnor,, PE <br /> <br />LAK~ CONCO~O <br /> <br />As you Ire aware ~ am tw~ major concerns at Lake Cor,;ord. The rmopaOo along the toe of <br />the clam must be collected In a drainage flekl alld the broken areas of the lower poRIon of the <br />spillway must be repaired. <br /> <br />I have ~mtacted, an engineering firm in ~, N. C. to asrdst me with the engineering on the <br />project On Mamh 19, lg97 BoMoomftekl (FrankC. Co¢fl~o~ & A~aoclate~) ed Irn~.withTIm <br />Lerner, Jim Leumas (Dam Safety Engl~ and Brian Moore (Moomsville office of the Land <br />Quality Section) at Like Concord to dl~3u# the~e two oone. em=. We are In agree'met ~ to the <br />proper approach requlrad to resolve the ~aage pmlNem. Several ldea~ wine e~ <br />regardk~g the repair to the extended spillway, va~ng from d~ng no~lng to a compk~ new <br />concrete IAmctum. We were able to c<~vlnce the Dam SM1Ry er~llneem th~ tt~ Im~illal~ cd <br />a toewall at the end o! the eM~lded spillway shou}d suffme for many ~ara. This will be an <br />expenr~ive job, but it isthe mo~t l~omlcal method. In addition to Ut]l ~ EWIll b/ <br />necasr.~y to bmek up the large pieces of broken ¢Ollcmte0 Idd moI~ Iai'ge Up-rap and di~ltlxlte <br />this broken concta~ and tip-rap around the Ipllllng bi.in ama in ruder to dlio~ the ~ ~ <br />downstream. <br /> <br />The ~ cosl for the ..r~, ~o11~, ~a'uctuml and cml m~linee~ing ~ inotuding <br />Inr~ Is $9,S00.00. <br /> <br />U,~I the Itudlel are complete It h~ Impolalbte to ~ you with In Iccurate col~ll't~-'Iio~ <br /> <br />repair requirements. I beliew that II rea~c~abte figure for the repaJm at Lake Concord will be <br />$00.500 plus the survey and engineering. Th~ will be · '~i budget estimate of $70.000. <br /> <br />FRANK L~KI~ PARY~ <br /> <br />The cost er, tlmate of the repatra to thla dam ~e~cern me rn~e than Lake Conoor~ We must <br />complele a !tc~,~ study of the drainage basin to clatemflrm the Nzes of the lxopos~l ~p,L,,T,n and <br />the spillway This study rn~y Indicate the neces~ty for adding ~ddltiom~l fmelx~'d to the dam. <br />The cmreet water level doetm't allow much ~orage be{om water ~ the dam. Th~ M~age <br />can be increased by ·riding height to the dam ~ by lowering ~he water level. Adding height will <br />bo ve~7 expe~v~ ~onekterlng the ~gth el the clam, I~t e~de, th3g ~'u~ure~ around ~ ~ rr~y <br />eliminate ~,e opportun~y tO k3wer the wate~ level. A de~rmfnaflon on th~s cannot be mede un~l <br />a study o~ t~e ex~ng eme~ency spillway ~ complete. <br /> <br /> <br />