My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1998 11 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1998
>
AG 1998 11 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:09:44 PM
Creation date
11/27/2017 11:52:51 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/16/1998
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" FOR INDUSTRIAL GRANT PURPOSES <br /> <br />Page 1 of 12 <br /> <br /> T~. CROSLAND GROUP <br />BSL DISTRmUTION CENTER <br />HARRISBURG, NORTH CAROLINA <br /> <br /> OCTOBER 13, 1998 <br /> <br />Brief Description of Proiect <br /> <br />Shelco, Inc. proposes to design and build the following: 112,000 sf warehouse, 60,000 sf <br />truss shop, 2 each 40'x240' storage sheds and a TJI storage 20'x150'. All design work <br />except civil engineering is included in the project. <br /> <br />The warehouse and truss shop will be structural steel frame with exterior walls consisting <br />of concrete tiltwall panels and an EPDM roof. <br /> <br />The two storage sheds and TJI storage shed will be pre-engineered metal buildings <br />designed/built by Ceco. The two storage sheds Will have 6' cantilevered roof on 3 sides. <br />The TII storage shed to be open on all sides. <br /> <br />The sitework shall consist of all grading, storm drainage, site utilities, asphalt and <br />concrete pavement, landscaping and fencing. A fuel oil containment structure will be <br />built for owner furnished fuel equipment. In addition, the existing railroad shall be <br />extended onto the property. <br /> <br />The following are the outline specifications for the v~rious components of the project. <br /> <br />NOTE: The difference in the cost of the project and the current tax <br /> value of the land is estimated at $6,746,800. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.