Laserfiche WebLink
W.W. Flowe School/Park <br /> <br />Ballpark Complex (6 Fields - 4 Baseball/Softball - 2 Soccer) <br /> A. Materials (Landfill/Property Maintenance Employees Provide Labor) <br /> <br />a. Silt Fence $ 2,700 <br />b. Stone Entrance 400 <br />c. Turf Seeding - 17 Acres 11,900 <br />d. Athletic Seeding - 9 Acres 9,000 <br /> Materials Total $ 24,000 <br /> <br />Contract Construction <br /> a. Erosion - check dams $ 7,000 <br /> b. Erosion - riser basin 5,000 <br /> c. Storm Drainage - 12" tees & elbows 1,320 <br /> d. Storm Drainage - 12" slope drain 11,220 <br /> e. Storm Drainage 15" RCP 1,200 <br /> Contract Total $ 25,740 <br /> <br />C. Construction Grade Staking $12,780 <br />D. Transportation Cost to move Landfill Equipment 2,500 <br />E. Fuel for Landfill Equipment 2,000 <br />F. Backstop/Fencing/Gates 54,000 <br />G. Team Benches/Infield Preparations/Cement Dugouts 10,000 <br />H. Spectator Bleachers (20) sets 26,000 <br />I. Field Lights (two baseball/softball and two soccer) 163,603 <br />J. Soccer Goals (2 Pairs) 4,000 <br />K. Park Signage 2,500 <br />L. Landscaping 5,000 <br /> <br />Subtotal <br /> <br />Other Recreational Opportunities A. Pit gravel trails 2,000 ft. <br /> B. Sand Volleyball (2 courts) <br /> C. Horsehoe Pits 4 Pairs <br /> D. Picnic Group Sites (8) <br /> <br />3. Restroom/Concession Building <br /> <br />A. Building (1,800 sq. ft.) <br />B. Concession Equipment <br /> <br />Subtotal <br /> <br />Subtotal <br /> <br />$ 9,500 <br />3,000 <br />800 <br />4~800 <br /> <br />70,000 <br />4,000 <br /> <br />$ 332,123 <br /> <br />$' 18,100 <br /> <br />$ 74,000 <br /> <br /> <br />