My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1997 02 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1997
>
AG 1997 02 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:27:18 PM
Creation date
11/27/2017 11:53:22 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/17/1997
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corning Incorporated <br />(Development Time Line) <br /> <br />December 1996 <br /> <br />Raytheon will submit preliminary site drawings. <br />Raytheon will submit construction drawings for three (3) 10,000 square feet buildings. <br /> <br />January 1997 <br /> <br />Construction will begin on 10,000 square feet buildings. During the construction process <br />these buildings will used for equipment/material storage areas. After the project is <br />complete they will used as maintenance faciltities. <br /> <br />Raytheon will begin to submit preliminary construction drawings. (Coming Incorporated <br />has requested that any review or storage of construction plans shall take place on site. <br />They will provide the office space needed by our staff if we will accommodate them on <br />this matter.) The reason for this request is that the drawings will contain information that <br />they consider proprietary to their company and do not want them available to the public. <br /> <br />April 1997 <br /> <br />Construction will begin on manufacturing facility. According to their representatives the <br />construction process will last eleven months which will bring the completion date to <br />around March of 1998. If possible, they will begin manufacturing a few months prior to <br />the completion of the entire facility. <br /> <br />Manufacturing Facility is to be approximately 350,000 to 400,000 square feet with several <br />accessory buildings. <br /> <br />Coming stated that they will need our inspectors on site throughout the entire project. <br />For a majority of the construction process we will need to have inspectors on site <br />approximately three (3) days a week for inspections which may require up to two (2) to <br />three (3) hours. The building, electrical, and mechanical trades will need to bear the <br />heaviest load. Periodically, throughout the process we will need to have inspectors to <br />work several hours of overtime in the evenings and on the weekends. Coming has stated <br />that they would reimburse the County for any overtime hours spent on their site. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.