Laserfiche WebLink
Jan-30-97 02:15A P.05 <br /> <br />Project No. 214)396 Raytheon/Rust Notes of Meeting GAM-041 Sheet 4 of 4 <br /> <br />ITEM DESCRIPTION OF DISCUSSION ACTION COMPL <br /> BY DATE <br /> County Inspector's Visit to West North Carolina <br />1.0 The Cart)anus County Inspection officials were invited to visit the T-5 construction <br /> stte to review how on-site review was handled by New Hanover County officials. In <br /> attendance were Mike Downs, Kenny McCombs, Roger Smith, Norris James, Bryan <br /> Burros and Harold Sinclair. <br />2.0 On site review of drawings. <br />2.1 Aubrey Ken' Walker arranged for meetings/conversations be{ween New Hanover and <br /> Carbarrus County officials. <br />2.2 The Cart:mn'us Cou~j offictels were taken to the on-site plan review room, The room <br /> is locked and county inspectors have keys for gaining access. Twa sets of plans (1 full <br /> size and 1 reduced copy) are maintained in this office. The office is solely fl3r use by <br /> the officials and is to be treated as their office. If additional telephones, desks, files <br /> ere needed A. Walker provides theft to assist in plan review. <br />2.3 At Concord, the Officials will be issued badges and vehicle passes to the site. Site <br /> access will not be restricted to the officials. A. Walker will also be at Concord and will <br /> be the primary contact for the county officials. <br />3.0 Tour of T-5 Construction Area <br />3.1 AJI officials are taken through the Tower 5 and the backyard area. Concord is similar <br /> to T-5 end as construction is still going on in T~5 everyone was able to see howthe <br /> Concord project will look during construction and initial occupancy. <br />3.2 The temporary wail between the initial operating areas and the om-going construction <br /> ('A' & 'B' areas} was exam[ned. Emergency egress was delineated and shown as <br /> taped aisles in the construction area. The same start-up philosophy will be used on <br /> Concord. <br />4.0 Code Compliance <br />4.1 Minutes of the meeting with the North Carolina State Department of Insurance will be <br /> distributed 23 Jan 97 to the State (B. Gupton) and Cerbarrus County Officials together <br /> with Coming and RE&C. <br />4,2 The Department of Insurance will not be reviewing the drawings on a regular basis es <br /> the building size is less than that requiring such a review. <br />4,3 A meeting will be held within 3 weeks to review the code compliance drawings with the <br /> Department of Insurance. Kenny McCombs requested to be in attendance at this <br /> meeting. RE&C will work with Barn/Gupton to finalize a date for the meeting and RE&C <br /> inform Mike Downs and Kenny McCombs. <br />4.4 RE&C to prepare a report of hazards and chemicals used In the process. RE&C <br />5.0 Zoning <br />5.1 RE&C to issue a write-up of the proposed landscaping to be in accordance with the RE&C <br /> zoning requirements for Carbarrus County. <br /> <br /> <br />