My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1996 01 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1996
>
AG 1996 01 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:57:06 PM
Creation date
11/27/2017 11:55:05 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/16/1996
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- WOLF MEADOW <br /> <br />_ ~_~ Clearing <br /> <br />Quanthy <br /> <br />Erosion control <br />a) silt fence <br />b) stone fdter basin <br /> <br />C~e_..5 c) inlet protection <br />~ 4~b d) stone entrance <br />~ e) riser basin <br /> <br />2082 <br />2 <br />12 <br /> <br />Unit <br /> <br />ACRES <br /> <br />LF <br /> <br />Grading 50,025 CU YDS <br />Fine Grading 55,600 SQ YDS <br /> <br />Storm Drainage <br />~a) 18~ RCP 1000 LF <br />b) 18' FES 2 EA <br />c) 24' RCP 562 LF <br />a) 24- F~S 1 E~ <br />e) 30" RCP 562 LF <br />\ 03o" FES 1 ~, <br />\g) precast area inlet <br />\ with steel grate 12 EA <br /> <br />_ L,~ L..$ Seeding 23 ACRE <br /> <br />TOTAL MATERIAL COST <br /> <br />-- SUBTOTAL COST ESTIMATE <br /> <br />CONSTRUCTION STAKING <br /> <br />CONTINGENCY ($288,210.00 x 10%) <br /> <br />(Unit) <br />(Material <br />Cost) <br /> <br />($1.00/LF) <br />($75.00) <br /> <br />($7-~0/10 <br />($325.00/ea) <br />($11.00/lf) <br />($325.oo/ea) <br />($17.00/10 <br />($400.oo/ea) <br /> <br />($700.00/ea) <br /> <br />($700.00/ac) <br /> <br />Materials <br /> <br />-0- <br /> <br />($2~082.00) <br /> <br /> goo.oo) <br /> <br />($7,5O0.OO) <br />(s65o. OO) <br />($6,182.OO) <br />($325.oo) <br />($9,554.00) <br />($4oo. OO) <br /> <br />($8,4OO.oo) <br /> <br />($L6,10O.OO) <br /> <br />($52,093.OO) <br /> <br />Unit <br />Price <br /> <br />$2,000.OO/ac <br /> <br />$230flf <br />$20OO.OO/ea <br />$240.00/ea <br /> <br />$800.oo/ea <br />$2500.oo/ea <br /> <br />$1 ~50/sq yd <br />$0.60/sq yd <br /> <br />$20.OO/If <br />$350.OO/ea <br />$25.O0/1f <br />$375.OO/ea <br />$35 .OO/If <br />$500.00/If <br /> <br />$1500.00/ea <br /> <br />$1300.00 <br /> <br />Total <br /> Cost <br /> <br />$46,000.00 <br /> <br />$5,205.00 <br />$4.000~00 <br />$2,880.00 <br /> <br />$800.00 <br /> <br />$75,038.00 <br />$33,360.00 <br /> <br />$19,670.00 <br /> $5oo.oct <br /> <br />$29,900.00 <br /> <br /> ($272,978.O0) <br /> $15,232.00 <br /> 28,821.00 <br /> <br />TOTAL = $317,031.00 <br /> <br />951319. L <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.