Laserfiche WebLink
0~723/96 11:]4 <br /> <br />271 14~8 <br /> <br />E JOHN KNApp <br /> <br />Color coordinald4On; materials selection for Owner and submiasion of color and m,~t~rials and <br />inst,.etlon ~ con_tractors. <br /> <br />12.2.3 Additional Construction Stage Services to be charged to-th? Owner on aahour~y basis for <br />coastu, l_.tant easts if required, et. costs nlus~10~ (See Paragraph I <br /> <br />~phic surve~ §v a local land surveyor, <br /> <br />Cost of providing measured..drawinga of any le_azed spaces or existing~faoiii .t~See <br />P___ara~,r~ph 3.4.6].. <br /> <br />Costs of soil boring, subsurface analysis and reports ~,t a ieee! engineer. <br /> <br />Site Development Engineering Wo~lg; <br />_When the local muaicipali~ re _msires engineering drawines, and/or specifications for. storm water <br />drainage, perkins, lot desires and drainage, landzeaphan, building location, ete.~=for the _on _rgose of <br />site 01an approval a~lor zoning approval, the architect shall be cO _mOeaaated on the basis of the <br />~_econd Stn_oe of this a~reement. <br /> <br />_Design of on-site (privatel sanitary ~ ti d rain fields. <br /> <br />Costs of alt ~cproduction including sets of hive-line drawings and printed specification, <br />ghotoreprodnctions, facsimile ~rimsmi~sion$. UPS, and postage charges. <br /> <br />Costs of a landscape Architect to prepare detailed landscape pJ~ns for buildin~ officials and bidding. <br /> <br />12.2.4 In the event of termination of the Agreement. per Article 6. and Article B. the appropriate <br />_cpmpcaaatiou for completion of the_p~t 5y others shall be equ~l go the Prelimina~t schematic <br />Desizn Phase. (PSDP) fee sums in the FirSI~ Stage. This compensation releases the copyrights and <br />the termination expenses _ocr Article 6 ami Article B. if term'.m, ated at comple.~ion of First Stage~_ <br />This Agreement entered into as of the day and'year first wriUen above.' <br />OWNER ARCHITECT <br /> <br /> <br />