My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1996 09 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1996
>
AG 1996 09 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 7:00:34 PM
Creation date
11/27/2017 11:56:11 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/16/1996
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8~96 <br /> <br />repairs will not exceed $300.00 per dwelling unit, nor involve more than twenty-five percent <br />(25%) of a surface area (i.e. roof, floor, ceiling, and interior/exterior walls that form the <br />envelope of the home). Repairs should be limited to those homes where other resources <br />(i.e. Urgent Repair Program, HOME Program) are not available. <br /> <br />B.) Reports <br /> <br /> Section 1: Monthly ReDorts. The Subcontractor shall submit by the sixth (6th) <br />day of each month Monthly Program Progress Reports to the Subgrantee on Forms <br />provided by the Subgrantee. Failure to provide these reports when due will result in <br />payment not being made for that month. <br /> <br /> Section 2: Quarterly Re.Dod;s, The Subcontractor shall submit by the eighth (8th) <br />day following each calendar quarter being reported on, a Comprehensive Quarterly Report, <br />standard form 272 (Federal Cash Transactions Report) <br /> <br /> Section 3: Interim Re~3orts. The Subgrantee may at its discretion request interim <br />repods from the Subcontractor that may be prompted by unforeseen circumstances that may <br />affect the operation of the Program. Failure to submit reports, when due, may result in the <br />termination of program funds. <br /> <br /> Section 4: Finel Reports. The Subcontractor shall submit a final closeout report <br />and remit any unobligated cash on hand within forty-five (45) days of contract termination <br />on forms provided by the Subgrantee. <br /> <br />Closeout reports for the Weatherization Assistance Program component noted in Part I, <br />section 4A, must include a complete physical inventory of materials remaining on hand at <br />contract termination, signed and dated by the checker and a witness. This inventory may <br />not be used after the termination of this contract by the Subcontractor, but may be sold at <br />cost to any subsequent weatherization program, with the dollar value to be credited to this <br />contract. <br /> <br />The Subcontractor shall submit to the Subgrantee such revisions and updates of these final <br />reports as may be necessary from time to time as a result of program audits or reporting <br />errors. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.