Laserfiche WebLink
October 16, 1995 <br /> <br /> Bulldtnx Spec%ficattons ~or the Rocky River Elementary School project - Mr. Steve <br /> Little. Parks aDd. gecreattoq Director <br />A. Reouest to Enlarge Gymnasium <br />B. Reoueq~ ~o Modify Outdoor Athletic Fields <br /> <br /> Mr. Steve Little, Parks and Recreation Director, presented the following <br />recommendations for the implementation of the school/park concept in the design <br />of the Rocky River Elementary School. <br /> <br />(1) Enlarge the gymnasium and add restrooms to accommodate the <br /> outdoor as well as the indoor facilities. The additional <br /> construction cost was estimated at $100,000.00 to $150,000.00 <br /> with specification revisions estimated at $10,000.00 to <br /> $15,000.00. <br />(2) Add three athletic fields to the two fields planned at the <br /> facility. The cost for the civil site plans and rough grading <br /> of the additional fields was estimated at $9,000.00 to <br /> $10,000.00. <br /> <br /> Mr. Gary Hahn, Chairman of the Cabarrus County Board of Education, <br />expressed support of the proposed changes provided that the County funds the <br />additional construction and design cost and the Schools can maintain the same <br />time line for construction of the new school. <br /> <br /> UPON MOTION of Commissioner Fennel, seconded by Commissioner Mills and <br />unanimously carried, the Board approved the addition of a full size gymnasium as <br />designed for Rocky River Elementary School at an estimated cost of $100,000.00 <br />to $150,000.00 and agreed that the architect's fees would be their hourly <br />contractual rate up to $10,000.00. <br /> <br /> UPON MOTION of Commissioner Fennel, seconded by Commissioner Mills and <br />unani~ously carried, the Board approved the addition of three athletic fields at <br />the Rocky River Elementary School for a total of five fields, including two <br />soccer fields and three baseball/softball fields. Grading costs were estimated <br />at $9,000.00 to $10,000.00 to put the additional fields in place. <br /> <br /> <br />