Laserfiche WebLink
February20,1995 <br /> <br />Mr. Henry Waldroup <br />Utilities Director <br />Cabarrus Co. Utility Department <br />P.O. Box 707 <br />Concord, NC 28025 <br /> <br />Re: <br /> <br />Muddy Creek WWTP <br />Change Order L-2 <br />HDR Project No. 00187-041-018 (CA) MC- 18-L <br /> <br />Dear Henry: <br /> <br />Attached please find five (5) copies of Change Order L-2 for the above referenced project. The <br />change order includes the extra cost for 12-inch D.I.P and ABC bedding stone at the Alpine Road <br />crossing, 12-inch D.I.P from Manhole No. 37 to Manhole No. 38, and 48-inch tunnel liner under <br />US Highway 601. Please disregard any previous versions of Change Order L-2. <br /> <br />Please review the change order; and if you are in agreement, send it through the proper channels <br />for processing. Upon approval, we would like to have two (2) copies returned to HDR and one <br />(1) copy returned to the contractor. The remaining copies would be for your files. <br /> <br />Please do not hesitate to call if you have any questions. <br /> <br />Sincerely, <br /> <br />HDR Engineering, Inc. of North Carolina <br /> <br />Paul C. Watson, Jr., P.E. <br />Project Manager <br /> <br />Attachments <br /> <br />cc: Robert Shinn <br /> <br />HDR Engineering, Inc. <br />of North Carolina <br /> <br />Suite 1400 <br />128 S. Tryon Street <br />Charlotte, North Carolina <br />28202-5001 <br /> <br />Telephone <br />704 338-1800 <br />Fax <br />704 338-6760 <br /> <br /> <br />