Laserfiche WebLink
Change Order No. L-2 <br /> <br /> EXHIBIT A <br /> <br />COST BREAKDOWN <br /> <br />Add the following bid items: <br /> <br />New DescriPtion Unit Quantity unit Price Total Price <br />Bid Item <br />21. Blasting and Removing Solid Rock CY 130 $ 50.00 $ 6,500.00 <br />22. Open Cut Crossing of Hopewell Church Road (Sta. LS 1 6,317.50 6,317.50 <br /> 73+25) <br />23. Open Cut Crossing of Garmon Mill Road (Sta. 100+32) LS 1 8,623.00 8,623.00 <br />24. Open Cut Crossing of Garmon Mill Road (Sra. 14+60) LS 1 3,579.00 3,579,00 <br />25. 12" D.I,P. Sanitary Sewer, 0'-6' Cut LF 305 39.20 11,956.00 <br />26. 12" D.I.P. Sanitary Sewer, 6'-8' Cut LF 53 41.20 2,183.60 <br />27. ABC Stone TN 55 9.80 539.00 <br />28. 48" Tunnel Liner under US Highway 601 (Sta. 101+65) LF 119 790.00 94,010.00 <br /> TOTAL $ 133,708.10 <br /> <br />Adjust Contract quantities for the following bid items: <br /> <br />6A 12" PVC Sanitary Sewer 0' - 6' LF (305) $ 26.00 $ (7,930.00 <br />6B 12" PVC Sanitary Sewer 6' - 8' LF (53) 30.00 (1,590.00 <br />7 20" Steel Encasement Pipe LF (35) 230.00 (8,050.00) <br />8 30" Steel Encasement Pipe LF (262) 230.00 (60,260.001 <br /> TOTAL (77,830.00) <br /> <br />Total Additions $133,708.10 <br />Total Deletions (77,830.00) <br /> Total $55,878.10 <br /> <br />(Vet 1.O Oct 1990) 1ll-5020~2 CHANGORD FRM <br /> <br /> <br />