Laserfiche WebLink
Map No. 5, Priority No. 14 - Rural <br />SR 2437, Rockwell Road, from SR 2436, <br />to Rowan County Line. Grade, drain, <br />base, pave and seed. Length 1.70 miles. <br /> <br />$ 155,000.00 <br /> <br />* This road is o~ly partially funded and funds to complete <br /> this project will come from our 1996-97 Secondary <br /> Construction Program unless additional funds are <br /> received. <br /> <br />Map No. 6, Priority No. 8F - Subdivision <br />SR 1569, Optimist Club Road, from SR 1155 <br />to a dead end. Grade, drain, base, pave <br />and seed. Length 0.21 mile. <br /> <br />$ 23,000.00 <br /> <br />Map No. 7, Priority No. 9F - Subdivision <br />SR 1174, Pineleaf Circle, from US 601 to <br />US 601. Grade, drain, base, pave and <br />seed. Length 0.40 mile. <br /> <br />$ 50,000.00 <br /> <br />Map No. 8, Priority No. 10F - Subdivision <br />SR 2815, Allen Drive, from SR 1394 to a <br />dead end. Grade, drain, base, pave and <br />seed. Length 0.30 mile <br /> <br />$ 36,000.00 <br /> <br />Map No. 9, Priority No. 11 - Subdivision <br />SR 1637, Wig Street, from SR 1636 to a <br />dead end. Grade, drain, base, pave and <br />seed. Length 0.04 mile. <br /> <br />$ 5,000.00 <br /> <br />Note: <br /> <br />If right-of-way cannot be obtained for one of the <br />above roads or if additional funds are received, <br />we will apply funds to next priorities. <br /> <br /> <br />