Laserfiche WebLink
CABARRUS COUNTY <br /> <br />ELECTRICAL AND MOBILE HOME FEES <br />EFFECTIVE JULY 1, 1995 <br /> <br />60 <br />100 <br />125 <br />150 <br />200 <br />225 <br />250 <br />275 <br />300 <br />325 <br /> <br />ampere service <br />ampere servxce <br />ampere service <br />ampere service <br />ampere service <br />ampere service <br />ampere service <br />ampere service <br />ampere service <br />ampere servlce <br /> <br />350 ampere service <br />400 ampere service <br />Temporary Service <br />Pools, grounding and wiring <br />Well service & sign <br />Change of service <br />LCD's (per residence) <br /> <br />$21.00 <br />26.00 <br />32.00 <br />37.00 <br />42.00 <br />47.00 <br />53.00 <br />58.00 <br />63.00 <br />68.00 <br />74.00 <br />79.00 <br />21.00 <br />21.00 <br />21.00 <br />21.00 <br />21.00 <br /> <br />Means of calculating a greater rating shall be $79.00 for the first 400 amperes plus 16 <br />cents per ampere over 400 amperes. <br /> <br />Commercial jobs where ampere service fees are not feasible, revert to the new <br />construction fee schedule. <br /> <br />There will be a twenty dollar ($20.00) re-inspection charge for any return trips to a job <br />site if the contractor, sub-contractor or owners is at fault for the re-inspection. <br /> <br />MOBILE HOMES <br />All mobile homes are required to have a permit to locate in Cabarrus County. The fee for <br />the permit will cover the mobile home, electrical, plumbing hook-up at a cost of one <br />hundred dollars ($100.00) per mobile home. <br /> <br />A plumbing permit for water/sewer is required on new spaces for all mobile homes. The <br />fee is sixteen dollars ($16.00). <br /> <br /> <br />