Laserfiche WebLink
00301-4 <br /> <br /> BIO SCHEDULE <br />(Revised per negotiations 10/27/95) <br /> <br /> ization (not to exceed <br />3% of Total Base Bid) <br /> <br /> scellaneous Site Work <br /> includes driveway <br /> , pruning of trees <br />over driveway, and remove <br />and replace shed roof and <br />corner post at driveway) <br /> <br /> ear Vegetation on Oam <br /> <br />I $1,375.04 $1,375.04 <br />I $¢,000.00 $4,000.00 <br /> <br />$7,800.00 <br /> <br /> Dewaterin~ 1 $2,850.00 $2,850.00 <br />S. lE~xtend Existing lO-inch CHP 12 $27.08 $324.96 <br />6. IRegrade Slope to 3H:IV 200 $6.00 $1,200.00 <br />7. )Type B Riprap (with filter 1,100 $24.00 $26,400.00 <br />lfabric and granular bedding <br />Imaterial) <br />B. IErosion Protection ! $Z,650.00 $Z,6S0.00 <br />9. lRepair and Reseed Disturbed 1 $2,¢00.00 $2,400.00 <br />J., IAreas ) <br /> <br />TOTAL BASE BIDS <br /> <br />$49,000.00 <br /> <br />TOTAL BASE BIDS (in words) Fo~ty-Ni~e Thousand andNo/)O0 Doll.ars _ <br /> <br />Item <br />Item <br /> <br />Item 3. <br />Item 6. <br />Item 7. <br /> <br />Item 9. <br /> <br />Adjusted to meet maximum specified. <br />Lump sum price adjusted for deletion of aggregate material cost <br />(aggregate to be supplied by Owner), and Contractor will not be required <br />to remove driveway between shed and dam and restore to lawn surface. <br />Removal of vegetation on upstream face of dam deleted from contract. <br />Unit price for fill material adjusted for use of local material. <br />Rip rap material to be provided by Owner. Filter fabric and granular <br />bedding requirements deleted, allowing reduced placement costs. <br />Seeding requirements changed to rescue/rye and area to be reseeded <br />reduced. <br /> <br />HELMS FAR~ POUND DAM REHABILITATION <br /> <br /> <br />