My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1994 02 07
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1994
>
AG 1994 02 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:31:00 PM
Creation date
11/27/2017 11:58:16 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/7/1994
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br /> <br />TO: John Day, Budget Officer <br /> <br />FROM:~Henry Waldroup, Utilities Director <br />DATE: January 21, 1994 <br /> <br />SUBJECT: PROJECT BUDGET ADJUSTMENTS <br /> <br />I started out with a fund of $200,000. the first deduction was <br />$7,843.10 from the projects completed in June 1993, but not billed <br />and deducted from the 92/93 budget. <br /> <br />The Plantation Road and Cold springs Road projects were projects <br />that were completed to provide water to areas where wells have <br />failed due to the drought this summer. The total cost of these <br />projects is $23,846.15. <br /> <br />The Hopewell Church and Jim Sossoman Road projects are projects <br />approved by the Board of Commissioners. The total project cost is <br />$201,429.00. <br /> <br />The Howell Center project is funded by Cabarrus County, the Howell <br />Center and C.D.B.G. funds. The project was bid for the use of both <br />6" or 8" force main line sizes. The cost of a 6" force main is <br />$542,723.38. This would provide sewer service to some of the <br />drainage basin and eliminate the problem sewer discharge from the <br />Howell Center. The cost of an 8" force main would be $593,921.40. <br />The difference between the six and eight is $51,195. The eight <br />inch force main increases the area drainage capability <br />considerably. The force main in some areas could be used for <br />gravity sewers greatly reducing future sewer line installation <br />cost. <br /> <br />The West Oak project along Miller Road and Charlie Walker Road <br />is being built by the owner, Alton Thigpen. He has agreed to <br />install an eight inch water line along Miller Road. The County <br />will pick up the difference between the 6" and the 8" pipe. The <br />cost difference is $6,408.24. The value of this project is <br />$50.061.75 <br /> <br />If I can answer questions or provide any additional information, <br />please do not hesitate to contact me. <br /> <br /> Utilities Department <br /> <br />232 uavidson Highway · ?. O. Box 707 · Concord, NC 28026-0707 · (704) 788~8164 · FAX (704) 788-$194 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.