Laserfiche WebLink
Mr. Henry F. Wa]droup <br />January 27, 1993 <br />Page 3 <br /> <br />Also we can't (or at least shouldn't) award the contract until the NPDI~R pemfit has been issued. <br />Therefore, the following schedule has been prepared based on limitations imposed by the soil <br />borings and NPDES permit: <br /> <br /> Submit final drawings to DEM July 2, 1993 <br /> <br />Advertise for bids <br />Open bids <br />Award construction contracts <br />Begin construction <br />Begin plant operation <br /> <br />Pleas call me if you need additional information. <br /> <br />July 15, 1993 <br />August 15, 1993 <br />October 1, 1993 <br />November 1, 1993 <br />October 1, 1994 <br /> <br />Sincerely, <br /> <br />lq'DR Engineering, Inc. of North Carolina <br />~y~ond D. Ha.milton, P.E., <br />Senior Project Manager <br /> <br />cc: Paul Watson <br /> <br /> <br />