Laserfiche WebLink
DESCRIPTION <br /> <br />CONSTRUCTION OF WATER MAINS TO SERVE 77 LOTS FOR THE WOODLANDS PHASE II ON <br />WEDDINGTON ROAD (SR ~1431) CONSISTING OF THE FOLLOWING: <br /> <br />* 2285 LF OF 6" WATER MAIN <br /> <br />* 1675 LF OF 2" WATER MAIN <br /> <br />* 4 FIRE HYDRANTS <br /> <br />* MISC. VALVES, BLOWOFFS, ETC. <br /> <br />THE SYSTEM CONNECTS TO EXISTING MAINS IN PHASE I AND AT ALAMANCE DRIVE <br />AND MONTICELLO DRIVE. <br /> <br /> <br />