Laserfiche WebLink
the Cabarrus County Utility Department. <br /> <br />It is understood and agreed that the APPLICANT and other parties <br />may discharge sewage into the proposed line or lines only under <br />and is accordance with the standard rules and regulations of the <br />DISTRICT, or as such regulations may be amended, with reference <br />to users of the DISTRICT sewerage system, particularly with <br />reference to the payment of standard sewage service charges which <br />are assessed by the DISTRICT against users of it sewerage system, <br />provided that any parties discharging sewage into the proposed <br />line or lines and who do not obtain their water supply from the <br />Cabarrus County Utility Department, for the purpose of <br />determining sewer service charges; such sewage service charges <br />shall be collected by and paid directly to the Cabarrus County <br />Utility Department. <br /> <br />Any connections, additions, or extensions to the herein described <br />sanitary sewer lines shall be made only upon written permission <br />of the DISTRICT. Such connections, additions, or extensions of <br />the herein described sewer lines shall not be subject to any <br />sanitary sewer connection privilege fees payable to this <br />agreement. <br /> <br />The APPLICANT shall obtain all rights-of-way in widths <br />satisfactory to the Director where sewer lines are constructed <br />across lands of the APPLICANT or others and being located in <br />other than a public way. The APPLICANT shall show satisfactory <br />evidence that he has obtained and recorded in the Cabarrus County <br />Registry, proper agreements covering rights-of-way and that the <br />same is free and clear of encumbrances. <br /> <br />The APPLICANT shall employ at his own proper cost and expense a <br />Professional Engineer registered in North Carolina who shall <br />design, layout and supervise the construction of these certain <br />sanitary sewer lines, including any lift stations and force mains <br />that my be required. Complete plans and profiles detailing all <br />proposed construction and equipment must be approved by the <br />Director prior to beginning any construction. Said construction <br />plans shall be prepared to DISTRICT standard plans and profiles. <br /> <br />The APPLICANT further agrees that upon approval of said <br />Contractor and sanitary sewer plans by the Director, the owner <br />of said properties requesting sanitary sewer shall guarantee the <br />installation of the required sanitary sewerage system. Upon <br />completion of the sewerage system as described, written notice <br />thereof shall be given by the APPLICANT to the Director, who <br />shall cause a final inspection of the sewerage system to be made <br />and shall within thirty (30) days accept the system for the <br />DISTRICT, provided all stipulations of this contract have been <br />met. <br /> <br />4 <br /> <br /> <br />