Laserfiche WebLink
CODDLE CREEK DAM AND RESERVOIR <br /> <br />BLYTHE INDUSTRIES INC. <br /> <br />CHANGE ORDER NO. 6 - ATTACHMENT A <br /> <br />Contract T~m. <br />De.rede <br /> <br />Additional Grout Related Items <br />Part A Dam and Reservoir <br />045 Additional Subcontractor Mobilization and related items 0 <br /> <br /> Lump Sum $8,537.03 (See Blythe Ltr of 12/11/92) 8,537.03 <br /> 046 Drill Through Zone A and/or Overburden <br /> 1,374.5 LF x $15.00/LF (See Blythe Ltr of 12/11/92) 20,617.50 <br /> 047 OSHA Exc. Report ($1 ~611.05 = 0.05% markup) 1,691.60 <br /> (See Blythe Ltr of 7/17/92) <br /> 048 Additional 0ewaterinc. I Costs (See HDR I.tr of 3/30/93) i 3,441.48 <br />:~:i :.:i:~:.~iiiiiii~:.ii!ii!:~iiiiii!!:.ii.?::~iii:? ::i~i:iiii:~:: ::::i i~ :::i~i:~i: :.:::i:~ii i::~ ::ii! ~: ~:iii:ilSubtotals I $0.001 $34.287.61 <br /> <br />oJ o <br /> <br /> Subtotal (?.~.,340.00 <br />Difference Net <br /> <br />9,942.30 <br /> <br />390.00 <br /> <br />350.00 <br /> <br />$14,048.301 01 0 <br /> <br />$48,335.91 I 0 0 <br />$3,995.91] 0 <br /> <br />004 Reduce the unit price for Borrow Excavation by $0.15/CY <br /> as per Blythe proposal dated 5/13/91. <br /> (295,600 CY x $0.15/CY) <br />058 Stockpiled Topsoil not Spread ( 11,047 CY x $0.90/CY) <br /> (See Blythe Ltr dated 8/4/92) <br />059 Temporary Mulching - NC 73 ( 5.1 Ac. x $660.00/Ac.) <br /> (See Blythe Ltr dated 11/27/91) <br />060 Standard Guardrail Delineatom ( 65 x $6.00/ea) <br /> (See Blythe Ltr dated 10/7/92) <br />061 End Guardrail Delineators ( 14 x $25.00/ea) <br /> (See Blythe Ltr dated 10/7/92) <br /> Subtotals 1($~,340.00 <br /> <br /> NC 73 Borrow and Miscellaneous Items <br />Part B NC 73 Relocation <br /> 0 <br /> <br /> <br />