Laserfiche WebLink
NORTH CAROLINA STATE DEPARTMENT OF TRANSPORTATION <br /> DIVISION OF HIGHWAYS. <br /> SECONDARY ROAD ADDITION INVESTIGATION REPORT <br /> <br />County Cabarrus <br />Township No. 1 <br /> <br />Co. File No. <br />Div. File No. <br /> <br />10.1246-C <br /> <br />Date 11-18-93 <br /> <br />Local Name Callisto Court <br /> <br />Subdivision Name Morrison Estates <br /> <br />Length 1,510 ft. Width 20 ft. Type 1-2 Condition Fair <br /> <br />Is this a subdivision street subject to the construction requirements for such <br />streets? Yes Recording Date 11-22-82 Book 20 Page 10 <br />Number of homes having entrances into road 6 <br />Other uses having entrances into road None <br />Right-of-Way Width 50 ft. If right-of-way is below the desired width, <br />give reasons under "Remarks and Recommendations." <br />Is petition (SR-1) attached? Yes <br />Is the County Commissioners Approval (SR-2) attached? Yes <br />If not, why? <br /> <br />Is a map attached indicating information for reference in locating road by the <br />Planning Department? Yes <br />Cost to place in acceptable maintenance condition: Total Cost $ b.oo <br /> <br />Grade, drain, stabilize $ o.oo , Drainage $ o.o0 , Other $. o.oo <br />Remarks and Recommendations Recommended to be added. Meets requirements for a <br /> <br />subdivision street. All repairs completed to bring street up to standards. <br />Raleigh Petition No. 38411. <br /> <br />Reviewed and Approved <br />BOARD OF TRANSPORTATION MEMBER <br /> <br />Reviewed and Approved <br /> <br />DIVISION ENGINEER <br /> <br />~/z/ DISTR~ ENGINEER <br /> <br />(Do not write in this space - <br />For use of Secondary Roads Dept.) <br /> <br />Petition No. <br /> <br />(Do not write in this space - <br />For use of Planning Dept.) <br /> <br />Form SR-4 (4/89)' <br /> <br /> <br />