My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1992 03 09
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1992
>
AG 1992 03 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:09:20 PM
Creation date
11/27/2017 12:01:10 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/9/1992
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{b). The maximum front footage charge shall be based cn <br />200 feet. <br /> <br />(c). A corner lot shall be charged for the longest side <br />(not to exceed 200 feet) if lines are installed on both <br />sides cf the property. If the line is installed on one <br />(I) side c, nly, the rate will be based cn that side. when <br />lines are installed on tke other side, the property shall <br />be charges for all footsge over and ak. ore that paid for <br />the initial installation, but still not to exceed 200 <br />feet. The rate paid for the second side shall be that <br />established for the second project. <br /> <br />4. The fees for this projects will be based on four (4) <br />separate charges: <br /> <br />(a). The front footage assessment. <br /> <br />(b). The current tap fees as noted in the County Rate <br />Schedule.. <br /> <br />(c). The current security deposit as noted in the County <br />Rate Schedule. <br /> <br />(d). The current set-up fees as noted in the County Rate <br />Schedule. <br /> <br />5. Any future connections to this line will be subject to the <br />standard policies in effect at that time and not tied to any <br />front footage charges relating to this project. <br /> <br /> Currently, $200,000.00 is available for these water line <br />extensions. The process for selecting the areas to be served will <br />be as follows: <br /> <br />1. Notification will be sent to all property owners in the <br />eleven areas of a public hearing, with the individual cost per <br />property owner included in the notification, for determining <br />owner interest in access to County water. <br /> <br />2. At the hearing, County staff will provide maps with <br />explanations of the proposed extensions. In addition, staff <br />will explain the front footage charge, the security deposit, <br />meter set-up fee, the tap fee and the monthly rates. <br /> <br />3. The construction scheduling will be based on the following <br />criteria: <br /> <br />(a). Date of approval by the County Commissioners. <br /> <br />(b). Availability cf County funds. (funds are available) <br /> <br />(c). Problems relating to the health and safety of the <br />residents. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.