Laserfiche WebLink
1.3.3 <br /> <br />1.3.4 <br /> <br />1.3.5 <br /> <br />1.4 <br /> <br />1.4.1 <br /> <br />.4.2 <br /> <br />.4.3 <br /> <br />1.4.4 <br /> <br />1.5 <br /> <br />Advise OWNER of any adjustments to the latest Opinion of Probable Construction <br />Costs caused by changes in general scope, extent or character or design requirements <br />of the PROJECT or Construction Costs. Furnish to OWNER a revised Opinion of <br />Probable Construction Costs based on the Drawings and Specifications. <br /> <br />Prepare for review and approval by OWNER, its legal counsel and other advisors, <br />contract agreement forms, general and supplementary conditions of the construction <br />contract, proposal form, invitations to bid and instructions to bidders, hereinafter <br />referred to as "Contract Documents." Separate Contract Documents will be prepared <br />for the interceptor sewer, wastewater treatment plant general contract, and wastewater <br />treatment plant electrical contract. <br /> <br />Furnish four copies of the above documents and of the Drawings and Specifications <br />and present and review them in person with OWNER. <br /> <br />Bidding Phase <br /> <br />After written authorization to proceed with the Bidding Phase, ENGINEER shall: <br /> <br />Assist OWNER in advertising for and obtaining proposals or negotiating proposals for <br />each separate prime contract as described in paragraph 1.3.4 for construction, <br />materials, equipment and services to be performed by a contractor for the project <br />(hereinafter called "Work"); and, where applicable, maintain a record of prospective <br />bidders to whom Contract Documents have been issued, attend pre-bid conferences <br />and receive and process deposits for Contract Documents. <br /> <br />Issue addenda as appropriate to interpret, clarify or expand the Contract Documents. <br /> <br />Consult with OWNER to determine the acceptability of substitute materials and <br />equipment proposed by potential contractor(s) when substitution prior to the award of <br />contracts is allowed by the Contract Documents. <br /> <br />Attend the bid opening and prepare bid tabulation sheets. Assist OWNER in <br />evaluating bids or proposals and in assembling and awarding contracts for <br />construction, materials, equipment and services. <br /> <br />Construction Phase - Administration of the Construction Contract <br /> <br />During the Construction Phase ENGINEER shall: <br /> <br />-3- <br /> <br /> <br />