Laserfiche WebLink
4.2 <br /> <br />4.2.1 <br /> <br />4.2.1.1 <br /> <br />4.2.1.2 <br /> <br />4.2.2 <br /> <br />4.2.2.1 <br /> <br />4.3 <br /> <br />4.4 <br /> <br />4.5 <br /> <br />dates by which services are to be completed are provided, and if such dates are <br />exceeded through no fault of ENGINEER, all rates, measures and amounts of <br />compensation provided herein shall be subject to equitable adjustment. <br /> <br />Period of Service for Each Phase <br /> <br />Each phase of services as outlined in SECTION 1 will be completed and submitted <br />within the stipulated period indicated, after written authorization to proceed with that <br />phase of services. <br /> <br />Project A (Muddy Creek Outfall AND WWTP) <br />Preliminary Design Phase (Predesign): 30 calendar days <br />Design Phase (Final): 120 calendar days <br />Project B (Midland/Wallace Road Waterline) <br />Design Phase: 45 calendar days <br />Completion of Services <br /> <br />ENGINEER's services under each Phase shall be considered complete at the earlier <br />of: (1) the date when the submissions for that phase have been accepted by OWNER; <br />or (2) thirty days after the date when such submissions are delivered to OWNER for <br />final acceptance. In each case, such additional time as may be considered reasonable <br />for obtaining approval of governmental authorities having jurisdiction to approve the <br />design of the PROJECT shall be added to that particular Phase. <br /> <br />Bidding Phase <br /> <br />After acceptance by OWNER of ENGINEER's Drawings, Specifications and other <br />Design Phase documentation, including the most recent Opinion of Probable <br />Construction Costs, and upon written authorization to proceed, ENGINEER shall <br />proceed with performance of the services called for in the Bidding Phase. This Phase <br />shall terminate and the services to be rendered thereunder shall be considered complete <br />upon commencement of the Construction Phase or upon cessation of negotiations with <br />a prospective Contractor. <br /> <br />Construction Phase <br /> <br />The Construction Phase-Administration of the Construction Project will commence <br />with award of the Contract for Construction and, together with ENGINEER's <br />obligation to provide Basic Services under this Agreement, will terminate when final <br /> <br />-11- <br /> <br /> <br />