FEB 14 '97 D?:~?,:'iI HZtR EN~'o CHARLOTTE
<br />
<br />A 21-inch effluent pipe will convey the trea!ed wastewater to the Rocky River.
<br />While discharge modeling has determined that reaeration of the effluent is not
<br />required, the discharge line will be stepped in drop manholes to provide
<br />additional aeration to the effluent as an additional low cost reaeration step. A
<br />disoh~rte header with effluent por~s will be laid perpendicular to shore
<br />extending into Rocky River to diffuse the effluent.
<br />
<br />O?nlou of Probable Construction Cost
<br />
<br />Table 3-2 presents information on the latest opinion of probable construction cost. The
<br />total capital cost is estimat~'.xi at 2.32 million dollars.
<br />
<br /> TABLE
<br /> Opinion of Probable Construction Cost
<br /> Muddy Creek Outfall Se~'s and WWTP
<br /> Cabarrus Count},, Nor~C~olina
<br /> Pan A - Ouffall Sewers
<br /> Mobilization 1 LS $19,000 $19,000
<br /> 18-L~ch Sewer 6,000 LF 45.00 2'/0,000
<br /> 21-~ch Sewer ~,800 LF 54.00
<br /> 4-fx~ot Diameter Manhole 30 EA 1,~00 ~9,000
<br /> ilO-inch Steel Casing 200 LF 150,00 i~0,000
<br /> Se~li~ ~ · . 25 AC 1,600 40,000
<br /> Pan B - Treatment Plant
<br /> Raw Sewage ~mp Stolon 1 LS $100,000 $100,000
<br /> Ch'it Removal & Screenir~ 1 LS 200,000 200,000
<br /> Grading & Site Work 1 LS 50,000 50,000
<br /> Modular Treatment Unit 2 EA 260,000 520,000
<br /> Chlorination 1 LS 70,000 70,000
<br /> Site Piping 1 LS 120,000 120,000
<br /> Sludge Drying Beds 1 L~ 60,000 60,000
<br /> Erosion Control 1 LS I0,000 10,000
<br /> Se,~diug I LS $,000 5,000
<br /> Subtotal A&B $1,792,000
<br /> Contingen¢i~ 1 ~,000
<br /> C. vnz~ru ~ion Cos~ $1,972,000
<br /> Technical Services 330,000
<br /> Land 110,000
<br />__ ,, ,, Project Capital Cost $'2,412,000