Laserfiche WebLink
2. Ail manholes for the interceptor line shall be con- <br />structed in the least obtrusive manner possible. No manhole covers <br />shall be more than two feet above grade. It is understood that this <br />will require that vent pipes be used at manhole locations where <br />necessary to ventilate the manhole above the 100 year flood plain. <br />The sewer line shall be vented no more frequently than every third <br />manhole. <br /> <br /> 3. The easement for the sewer line will be a maximum width <br />of 20 feet for the permanent easement and 40 feet for the construc- <br />tion easement. <br /> <br /> 4. The County warrants that, following construction of the <br />sewer line, the surface of the ground shall be restored as nearly as <br />possible to its original condition and shall be planted so as to <br />prevent erosion. The plantings shall be consistent with existing <br />vegetation. It is agreed that Kentucky 31 Fescue is an acceptable <br />ground cover. <br /> <br /> 5. No part of the Project shall be constructed upon the <br />John Bunyan Green Farm, except the sewer interceptor line on the west <br />side of Muddy Creek terminating at the raw sewage pump station (the <br />"Pump Station"), the Pump Station as hereinafter described, the sewer <br />force main line from the Pump Station to the Wastewater Treatment <br />Plant and an access road located on a 100 foot wide strip of land <br />extending from the west property line of the John Bunyan Green Farm <br />to the Pump Station, and a chain-link fence, other fences, and <br />necessary gates on said strip of land. <br /> <br /> 6. The Pump Station shall be located approximately 500 <br />feet northwest of the mouth of Muddy Creek on the west side of Muddy <br />Creek at an elevation above 465 feet above sea level. The general <br />location is designated on Exhibit "A" hereto. It is understood and <br />agreed that the exact location of the Pump Station cannot be deter- <br />mined until an actual physical survey has been completed. The <br />interceptor line shall terminate at the Pump Station. The Pump <br />Station facilities shall consist of an at grade concrete flow <br />splitter chamber with water tight manhole cover and vent pipe <br />extending above the 100 year flood elevation and concrete <br />screening/pumping structures with top of walls extending above the <br />100 year flood elevation. The Phase I/II screening/pumping structure <br />will be approximately 40 foot by 20 foot and the Phase III/IV <br />screening/pumping structure will be approximately 50 foot by 25 foot <br />constructed immediately adjacent to the Phase I/II structure. The <br />Pump Station facilities may also include an above grade structure to <br />house electrical equipment, standby electrical generators, odor <br />control equipment, hoists, ladders, screenings containers, parking, <br />and other ancillary functions as required for a complete raw sewage <br />screening and Pump Station facility. The County warrants that there <br />shall be excess pumping capacity so that if there is a malfunction in <br />any one pump, the remaining pumps will have pumping capacity in <br />excess of the maximum flow of raw sewage. The Pump Station shall <br /> <br /> <br />