Laserfiche WebLink
DESCRIPTION <br /> <br />CONSTRUCTION OF SANITARY SEWER MAINS TO SERVE 51 LOTS FOR THE <br />WOODLANDS PHASE 1 ON WEDDINGTON ROAD SR % 1431 CONSISTING OF THE <br />FOLLOWING: <br /> <br />* 3610 LF OF 8" GRAVITY MAINS <br />* 16 MAN HOLES <br />* 3090 LF OF 8" FORCE MAIN <br />* PUMP STATION <br /> <br />THE SYSTEM CONNECTS TO THE EXISTING GRAVITY SEWER MAINS IN CARRIAGE <br />DOWNS PHASE 1 AND THEN TO THE EXISTING PUMP STATION. <br /> <br /> <br />