My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19910218
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19910218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:43 AM
Creation date
11/27/2017 12:02:59 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/18/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br />m <br /> <br /> any ~ork or materials condemned as unsatisfactory by <br /> the County Engineer and shall rebuild and replace same <br /> m to the standard required by the specifications, all at <br /> his own expense and in default thereo~, the same may be <br /> done by the District and the cost charged against the <br /> m Applicant. Final connection to the District's water <br /> system will not be'permitted until all work has been <br /> approved by the Director and a letter of certification <br /> by the designing Engineer received by the Cabarrus <br /> m county Utility Department. <br /> <br /> The District ~hall own all facilities installed under <br />m this contract and shall collect all revenues for service <br /> rendered from said water mains at the rate set forth in <br /> the rules and regulations of the District. <br />m 5. Any connections, additions, or extensions to the <br /> herein described water lines shall be made only upon <br /> <br /> m written permission of the District. <br /> &. The Applicant shall employ at his own proper cost and <br /> expense a Professional Engineer registered in North <br /> m Carolina who shall design, lay out and supervise the <br /> construction Df these certain water lines. Complete <br /> plans and profiles detailing all proposed construction <br />m and equipment must be approved by the Director prior to <br /> beginning any construction. Said construction plans <br /> shall be prepared District standard plan and profile <br /> paper as per District standards. <br />m 7. The Applicant further agrees that upon approval of said <br /> Contractor and water plans by the Director, the owner <br /> m of said properties requesting water service shall <br /> guarantee the installation of the required water <br /> system. Upon completion of the water system as <br /> <br /> m described, written notice thereof shall be given by the <br /> Applicant to the Director, who shall cause a ffnalT <br /> inspection of the water system to be made and shall <br /> within thirty (30) days accept the system for the <br /> m District, provided all stipulations of this contract <br /> have been met. <br /> <br /> m s. After completion of all construction, the Applicant <br /> shall furnish the original drawtngs of all construction <br /> plans, revised to show any and all revisions <br /> encountered during construction, to the Dlstrtct marked <br />m "As-Built". The final shall show the actual <br /> plans <br /> condition in which the facility was physically <br /> constructed and/or installed. Further, the final plans <br />m shall show the correct location of the facility as. it <br /> related to easements, right-of-way lines, property <br /> lines, buildings, under,round and/or overhea~ utility <br />m ltnes~ roadways, railroads, and ail other physical <br /> features that would have any effect or influence upon <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.