My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19910218
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19910218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:43 AM
Creation date
11/27/2017 12:02:59 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/18/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t~e Director pr%or to beginnmng any construction. <br /> <br /> standard plan and profileo <br /> <br />8. The Applicant further agrees that upon approval of zaid <br /> C~ntractor and sanitary sewer plans by the Director. <br /> the ot-~ner of said properties requesting sanitary <br /> ~hall ~uarant~e the installation of the <br /> sanitary sewerage system. Upon completion of the <br /> ~eraqe system a~ described~ ~ritten notl.ce thereof <br /> ~hal! be given by the Appl-icant to the Director, ~no <br /> shall cause a final inspection of the sel<eraQe ~yste~ <br /> to be made ~nd shall ~ithin thirty (30) days accept the <br /> system for the District, provided all stipulations of <br /> this contract have been met. <br /> <br /> After completion of all construction, the Applicant <br /> shall fu~-nish the original dra~ings of all construction <br /> plans~ revised to shol~ any and all revision~ <br /> e,~countered during construction, to the Caba~-rus County <br /> Utility Department marked "As=Built". The final plans <br /> ~hall sho~ the actual condition in ~vhich the facility <br /> was physically constructed and/or i~stalled. Further, <br /> the final plans shall sho~ the correct location of the <br /> facility as it related to easements, right-of-way <br /> lines, property lines, buildings? underg~'ound and/or <br /> overhead utility lines~ ~-oadl~ays, railroads~ and all <br /> other physical features that would have any effect or <br /> influence upon the constructed facility. The <br /> Professional Engineer employed to design the facility <br /> shall be responsible for the accuracy and completeness <br /> of the facility as shown on the final edition of the <br /> original construction plans. These original drawings <br /> shall become the property of the District. <br /> <br />10. -It is further understood and agreed that if any of the <br /> above described sewer lines are served by or connected <br /> in any manner to pressure lines of lift stations, the <br /> design of such pressure lines and lift stations shall <br /> be in accordance with the requirements of the ~abarrusT <br /> County Utility Department and shall be designed to <br /> cover any future expansion necessary to accommodate all <br /> anticipated flo~s in the drainage area in which the <br /> lines are located. <br /> <br />11. It is understood and agreed that when the described <br /> sewer system is constructed according to the plans, <br /> specifications, and standards of the Water and Sewer <br /> District of Cabarrus Cou~t¥~ said sewer system shall <br /> automatically become the property of. the District <br /> without cost to the District, and without further <br /> agreement in connection therewith. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.