My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19910325
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1991
>
AG19910325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:47 AM
Creation date
11/27/2017 12:03:10 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/25/1991
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> <br /> The County's responsibility shall be limited to that <br /> material located in the right of way acquired by the County <br /> for eaid project as set out in Item ~2 above. Any <br /> hazardous'material discovered in the existing right of way <br /> owned by the Department prior to acquisition of right of <br /> - <br /> way by the County for construction of this project shall be <br /> the responsibility of the Department. The County shall be <br /> solely responsible for any dsmages caused by the existence of <br /> said material now and at any time in the future and will save <br /> the Department harmless from any legal actions arising as a <br /> result of this contaminated and/or hazardous material within <br /> the newly acquired right of way. <br /> <br /> 4. The County shall design and prepare plans and <br /> specifications for the project in accordance with the <br /> Department's standard practices for highway construction. <br /> Plans are to be submitted to the Department for its review <br /> and approval. <br /> <br /> 5. The Department shall Construct the project in <br />accordance with the plans and specifications adopted <br />therefor, or as altered or amended by the Department. <br /> <br /> 6. The County shall participate in twenty nine percent <br />(29%) of the actual construction costs of the project. The <br />Department may invoice the County monthly for costs incurred. <br />Reimbursement by the County shall be within thirty (30) days <br />of the date of invoice from the Department, <br /> <br /> 7. Traffic control devices shall be the responsibility <br />of the Contractor as part of the construction contract. <br /> <br /> f <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.